Quote:
Originally Posted by gecho111 View Post
The initial pitch went from being conveniently located to a substation, to SaskEnergy building a high pressure natural gas line to the site for them to run their own power plant.
It is my understanding that they will run off the SaskPower grid at least initially but the back-up/supplemental generators will run off TransGas gas. I assume this will like Interpro Steel deal with SaskPower, their electricity can be throttled by SaskPower when there is a system shortage or outage. Bell will then replace or supplement the grid power with their own generation.

I suspect they would eventually look at their own utility-scale gas-fired generating station, but that would take years to plan and build.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 6:02 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.