It looks like the storm drain pipe for Arens is in all the way to Anaquod Road so it should be ready to build the road. They were hammering in sheet piles in AE Wilson park to hold back the dirt when they start installing pipe under the creek.
I am gonna assume we are still many years away until Chuka BLVD gets extended to link up with Aurora BLVD. Does anyone know if a developer even owns the land in between there or still owned farmland.