HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #35  
Old Posted Sep 19, 2025, 3:02 PM
Altoic's Avatar
Altoic Altoic is offline
Registered User
 
Join Date: Nov 2020
Location: Florida
Posts: 1,538
Crews Prepare for Historic Concrete Pour at The Residences at 1428 Brickell on September 19
https://floridiandevelopment.com/crews-p...dences-at-1428-brickell-on-september-19/

Quote:
Crews behind 1428 Brickell are preparing for a historic milestone. On September 19, a massive foundation pour will begin at 8 p.m., led by C & C Concrete Pumping. With Capform as shell contractor, UES handling concrete testing, and Coastal Construction serving as general contractor, the team will pump an estimated 13,000 cubic yards of concrete into place.

The operation is expected to last 30 continuous hours, supported by five concrete pumps working simultaneously. Reinforcement steel is already in place, setting the stage for one of the largest foundation pours in Miami’s history. Comparable pours include the foundations of the Aston Martin Residences, Panorama Tower, and the Waldorf Astoria Miami, all of which exceeded 10,000 cubic yards.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 1:48 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.