Posted Sep 4, 2025, 9:03 PM
|
|
Registered User
|
|
Join Date: Dec 2015
Posts: 15,624
|
|
Peterson's Ashleigh drone footage
Quote:
- Bulk Excavation, Topsoil Stripping & Ocean Disposal (~25,000 m3)
- Detail Excavation for foundations, footings and 2 x tower crane bases
- Detail excavation for mechanical & electrical under-slab utilities, drain tiles, sumps and catch basins
- Shoring – Installation of spiles, steel pipe piles, anchors and shotcrete wall.
|
https://www.instagram.com/p/DN6b5UmjSal/
|