Originally Posted by mcj
The ridership memo (linked pdf) shows that the Production Way branch could start running through to Arbutus during peak times in 2035. Perhaps this operating pattern is moved forward to provide that extra capacity on the Broadway to Brentwood section of the Millennium Line without sending too many longer trains to Coquitlam once the Broadway Subway is completed.
|