Quote:
Originally Posted by Migrant_Coconut
Whereas under the Libs, we'd have a $12b bridge (or none at all) and zero SkyTrains being built. Given that cross-border traffic has suddenly fallen off a cliff, it looks like we dodged a bullet.
Probably the cost of the Langley extension, which was hiked up due to Covid supply chain disruptions. Currently under pre-construction as we speak.
|
Traffic through the tunnel has little to do with crossborder traffic and much more to do with Canadians living south of the Fraser and working north of it, going to the airport etc etc.