Posted May 9, 2025, 4:42 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,021
|
|
Over 50% of the 7th floor walls on now poured on the 7s building. The forming for the ground floor slab on the 11s is well underway now. They have a piling drilling machine working the south side property line which may be for the continuation of the parking garage structure along that side.
|