Posted Mar 28, 2025, 4:57 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,085
|
|
They have now got most of the 4th floor steel modular wall panels installed on building A. Forming for the 2nd floor slab on building B is wrapping up and should be poured very soon. Work still happening on the foundation footing forming for building C.
|