HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 30, 2024, 1:24 PM
davidivivid davidivivid is online now
Registered User
 
Join Date: Jul 2010
Location: Ville de Québec City
Posts: 3,012
Interesting part about this 350 units project is that the City, for the very first time, used a provision of the recently adopted Bill 31. This provision allows any city with more than 10,000 inhabitants and a vacancy rate below 3% to authorise residential projects considerably faster than what would normally be allowed under the Loi sur l’aménagement et l’urbanisme. The city estimates that using this provision will shorten the overall delivery date by about a year.

Not the most exiting building architecturally speaking but a good effort to reduce its carbon footprint with the use of geothermal heating. 24% of the lot will also be reseved for green spaces.


Quote:
Originally Posted by FrAnKs View Post
13 fl. - Quebec City (Ste-Foy)
Construction starts this summer



__________________
"I went on a diet, swore off drinking and heavy eating, and in fourteen days I lost two weeks" Joe E. Lewis

Last edited by davidivivid; May 30, 2024 at 1:36 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 2:40 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.