Quote:
Originally Posted by bobdreamz
I have 18 Under Construction for Miami so I don't know where the the numbers are off. Perhaps 2 of them completed construction already?
|
CTBUH is notoriously wrong/slow to update their system. They forgot to include Cipriani Residences and Casa Bella which would make it 18.
Here is what my list would be:
1) Waldorf Astoria
2) Cipriani Residences
3) Okan
4) Baccarat
5) Aston Martin (Final touches being made, will probably be removed next month)
6) Mercedes-Benz Places
7) 830 Brickell
8) E11even
9) E11even beyond
10) Legacy
11) Miami River
12) Aria North
13) Aria South
14) Casa Bella
15) Una Residences
16) Natiivo
17) Miami World Tower 1
18) 2600 Biscayne
JEM, Lofty, and HUB all have crews on site from what I saw, but they're slow moving and haven't begun real foundation work since their groundbreakings. I think LOFTY has dewatering and foundation drilling?? But I doubt CTBUH really cares unless they see photos of physical piles going into the ground.
The HUB is special because they're taking the old shell of the stalled project on site and preparing it for construction. But when all is said and done with the projects beginning foundation work, I'd say Miami will have 20 U/C excluding Aston Martin because that's practically done.