HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jan 11, 2024, 5:27 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,038
Quote:
Originally Posted by drew View Post
You would still need to re-route traffic while the bridge is under construction - maybe a roundabout solves that issue by pre-building the re-routed traffic allowance that could then be used in the future when the bridge never gets built....
They can get away with the usual detouring traffing to either the WB or EB lanes using the existing roadway, down to 1 lane each way. It's not like Perimeter where 1 lane would cripple traffic at rush hour and they had to put some work in to rejig the 2 travel lanes.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 12:49 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.