Quote:
Originally Posted by drew
You would still need to re-route traffic while the bridge is under construction - maybe a roundabout solves that issue by pre-building the re-routed traffic allowance that could then be used in the future when the bridge never gets built....
|
They can get away with the usual detouring traffing to either the WB or EB lanes using the existing roadway, down to 1 lane each way. It's not like Perimeter where 1 lane would cripple traffic at rush hour and they had to put some work in to rejig the 2 travel lanes.