Quote:
Originally Posted by SL123
Technically unrelated to the Slayte but I cant believe they are completely redoing Slater St and not burying the hydro and removing the poles from the sidewalk.
|
I'm unclear about the project. Have they/are they digging up Albert and Slater, replacing the utilities, or is is just a surface layout improvement?
I would assume they rebuilt Albert and Slater in the 80s or 90s for the Transitway, so replacing the century old infra would have been done at the time? Or maybe not since they were planning a tunnel at the time.