  #7761  
Old Posted Mar 22, 2023, 9:22 PM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by aberdeen5698 View Post
There's no flyover at the junction just east of Lougheed Mall...
... which is why trains have to wait for the track to clear depending on which direction they're approaching from. The setup at LTC is not ideal for branching and doesn't allow 100% cross-platform transfers like Bridgeport.
     
     
  #7762  
Old Posted Mar 22, 2023, 10:14 PM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
How would you fix LTC so it only uses the center platform and handled the branch lines better?
     
     
  #7763  
Old Posted Mar 22, 2023, 11:03 PM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by Mac Write View Post
How would you fix LTC so it only uses the center platform and handled the branch lines better?
I don't know enough to be sure if LTC can be fixed easily (i.e. no full rebuild), but there's no reason to repeat the "mistakes" of the past. New train lines are expensive, so you might as well get it right the first time.
     
     
  #7764  
Old Posted Mar 23, 2023, 5:54 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by Helvetia View Post
... which is why trains have to wait for the track to clear depending on which direction they're approaching from. The setup at LTC is not ideal for branching and doesn't allow 100% cross-platform transfers like Bridgeport.
Of course. But my point is that they've already built one line branch without a flyover (even though it was originally intended to have one) so you can't use the lack of a flyover as an argument that they won't build another branch at King George.
     
     
  #7765  
Old Posted Mar 23, 2023, 6:08 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,173
Quote:
Originally Posted by aberdeen5698 View Post
Of course. But my point is that they've already built one line branch without a flyover (even though it was originally intended to have one) so you can't use the lack of a flyover as an argument that they won't build another branch at King George.
Originally intended as in circa 2002 or earlier? The flyover as designed when the station was built was just to correct the wrong railing of trains Coquitlam bound, all the current switches would still exist.

Did the earlier north-south aligned station design have full flyovers?
EDIT: As of 1998 it didn't; page 219 https://www2.gov.bc.ca/assets/gov/enviro...roject-reviews/skytrain-final-report.pdf

Last edited by madog222; Mar 23, 2023 at 6:24 AM.
     
     
  #7766  
Old Posted Mar 23, 2023, 4:18 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by madog222 View Post
Originally intended as in circa 2002 or earlier? The flyover as designed when the station was built was just to correct the wrong railing of trains Coquitlam bound, all the current switches would still exist.
True enough. Doesn't change the fact that we have a proven "track record" of designing line branches without flyovers, and therefore lack of a flyover at King George is not evidence that there won't be provision for a branch built there.
     
     
  #7767  
Old Posted Mar 23, 2023, 4:38 PM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by aberdeen5698 View Post
True enough. Doesn't change the fact that we have a proven "track record" of designing line branches without flyovers, and therefore lack of a flyover at King George is not evidence that there won't be provision for a branch built there.
Fair enough, it would be possible to branch off at King George (though I think it's fair to say neither of us want such a branch).
     
     
  #7768  
Old Posted Mar 23, 2023, 6:34 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,173
Plus there are the level switches for the Port Coquitlam spur, those are newer than the Canada Line.
     
     
  #7769  
Old Posted Mar 23, 2023, 7:03 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by madog222 View Post
Plus there are the level switches for the Port Coquitlam spur, those are newer than the Canada Line.
Actually, I think the only place that we have an honest-to-god flyover is at Bridgeport, which is crazy because the frequencies on both spurs are limited by the single tracking to the last stations. You really gotta wonder why they bothered in a project where they cheaped out on the station lengths...
     
     
  #7770  
Old Posted Mar 23, 2023, 7:18 PM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,173
Quote:
Originally Posted by aberdeen5698 View Post
Actually, I think the only place that we have an honest-to-god flyover is at Bridgeport, which is crazy because the frequencies on both spurs are limited by the single tracking to the last stations. You really gotta wonder why they bothered in a project where they cheaped out on the station lengths...
I wonder if being a P3 contract influenced this. Would the extra cost be lower than 30 years of maintenance on two more switches.

There is the split east of Columbia but I wouldn’t really count that (as purpose built) as the bridge approach is being utilized as a flyover.
     
     
  #7771  
Old Posted Mar 23, 2023, 8:10 PM
chowhou's Avatar
chowhou chowhou is online now
Registered User
 
Join Date: Sep 2019
Location: East Vancouver (No longer across the ocean!)
Posts: 3,761
Quote:
Originally Posted by aberdeen5698 View Post
Actually, I think the only place that we have an honest-to-god flyover is at Bridgeport, which is crazy because the frequencies on both spurs are limited by the single tracking to the last stations. You really gotta wonder why they bothered in a project where they cheaped out on the station lengths...
Does the Columbia - Skybridge - Millennium Line extension "fly under" not count?
     
     
  #7772  
Old Posted Mar 23, 2023, 9:53 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,788
Quote:
Originally Posted by chowhou View Post
Does the Columbia - Skybridge - Millennium Line extension "fly under" not count?
It does, forgot about that one!
     
     
  #7773  
Old Posted Mar 24, 2023, 12:41 AM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,673
Quote:
Originally Posted by madog222 View Post
Plus there are the level switches for the Port Coquitlam spur, those are newer than the Canada Line.
Agreed - my thoughts too.

Quote:
Originally Posted by aberdeen5698 View Post
Actually, I think the only place that we have an honest-to-god flyover is at Bridgeport, which is crazy because the frequencies on both spurs are limited by the single tracking to the last stations. You really gotta wonder why they bothered in a project where they cheaped out on the station lengths...
I think the short trains are exactly the reason why they have the flyovers
- because the flyovers support the higher frequency required (by the smaller trains) to get to ultimate capacity.
The single tracking came late in the process.
     
     
  #7774  
Old Posted Mar 28, 2023, 4:11 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,173
Shortlisted contractor teams have been announced for the stations contract.
Surprise! It's the same two teams as were shortlisted for the guideway contract.

https://news.gov.bc.ca/releases/2023MOTI0038-000388

Contract is scheduled to be awarded next year.

Contract for the guideway is due this fall. Shortlist for the track & systems contract should be soon with contract award next year.
     
     
  #7775  
Old Posted Apr 4, 2023, 6:06 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888
Quote:
Originally Posted by madog222 View Post
Shortlisted contractor teams have been announced for the stations contract.
Surprise! It's the same two teams as were shortlisted for the guideway contract.

https://news.gov.bc.ca/releases/2023MOTI0038-000388

Contract is scheduled to be awarded next year.

Contract for the guideway is due this fall. Shortlist for the track & systems contract should be soon with contract award next year.
Masstransitmag.com:
British Columbia shortlists two teams for Surrey Langley SkyTrain stations package by Mischa Wanek-Libman March 30, 2023
https://www.masstransitmag.com/rail/infr...surrey-langely-skytrain-stations-package

BIV.com:
Acciona shortlisted for more SkyTrain contracts, despite North Shore Wastewater Treatment Plant turmoil
Metro Vancouver hired Acciona as a contractor in 2017 for the North Shore Wastewater Treatment Plant project, which has been delayed and run over budget By Bob Mackin | March 28, 2023, 9:31am
https://biv.com/article/2023/03/acciona-...contracts-despite-north-shore-wastewater
     
     
  #7776  
Old Posted Apr 6, 2023, 1:53 AM
superelevation superelevation is offline
Registered User
 
Join Date: Oct 2020
Posts: 50
Quote:
Originally Posted by aberdeen5698 View Post
True enough. Doesn't change the fact that we have a proven "track record" of designing line branches without flyovers, and therefore lack of a flyover at King George is not evidence that there won't be provision for a branch built there.
A flyover is great, but you only need one if the frequency of service over the junction is sufficiently high. Assuming Expo has 3 branches with one to LTC, one to Langley, and one to KGB traffic to Langley and KGB may not be sufficient to justify a flyover (I would assume this is part of the justification with the POCO split too - plus you will have additional platforms at Co Central).

The REM in Montreal will only have it's "innermost" junction between the DM Line and the West Island + Airport Lines as a flying junction, the one between WI and Airport is flat.
     
     
  #7777  
Old Posted Apr 6, 2023, 3:49 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
Frequency's only part of the problem. If one of the switches fails, that's two branches out of service and needing a bus bridge.
     
     
  #7778  
Old Posted Apr 6, 2023, 3:56 AM
Helvetia's Avatar
Helvetia Helvetia is offline
Registered User
 
Join Date: Jan 2023
Location: North Delta
Posts: 98
Quote:
Originally Posted by Migrant_Coconut View Post
Frequency's only part of the problem. If one of the switches fails, that's two branches out of service and needing a bus bridge.
Ah but that'll never happen. What's the chance a switch fails at a critical point like the SkyBridge /s
     
     
  #7779  
Old Posted Apr 6, 2023, 4:01 AM
madog222 madog222 is online now
Moderator
 
Join Date: Jan 2014
Posts: 4,173
Quote:
Originally Posted by Migrant_Coconut View Post
Frequency's only part of the problem. If one of the switches fails, that's two branches out of service and needing a bus bridge.
If a switch fails, in either configuration, it can run single tracked. Having a flyover makes no difference, only two fewer switches to potentially fail.
     
     
  #7780  
Old Posted Apr 6, 2023, 4:05 AM
Migrant_Coconut's Avatar
Migrant_Coconut Migrant_Coconut is offline
Registered User
 
Join Date: Oct 2015
Location: Kitsilano/Fairview
Posts: 10,131
Quote:
Originally Posted by madog222 View Post
If a switch fails, in either configuration, it can run single tracked. Having a flyover makes no difference, only two fewer switches to potentially fail.
My bad, I got confused with the OP that mentioned an independent Newton line: that would mean a shutdown on one line wouldn't affect the other.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:02 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.