Quote:
Originally Posted by esquire View Post
Very unlikely in the sense of building shared corridors. Even the existing SW BRT (aka the "Blue Line") was originally conceived as a route that would share the CN ROW near Pembina Highway but it was shifted west to a much wider hydro corridor.

Most of the rail corridors are quite narrow and at first glance it seems unlikely that they could accommodate BRT/eventual LRT without very costly means like elevated structures.
That is quite a valid point, but surely it would cost less then building brand new infrastructure that we’ve been doing for BRT that already possesses elevated structures.

Also, it doesn’t necessarily have to be a shared corridor either and could be just an alternative source of public transportation to the existing/future BRT lines. This could then provide more coverage of public transportation to Manitobans in a more efficient manner.

Either way it’s up to CN if they’re ever willing to move out of Winnipeg proper which I venture is highly unlikely in the foreseeable future.
Reply With Quote
     
     
  #2342  
Old Posted Aug 19, 2021, 3:24 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,076
Quote:
Originally Posted by swimmer_spe View Post
How big was Ottawa before they started on something more than the original O-Train and Transitways?
Edmonton's LRT opened in 1978 with a population of 478,000.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #2343  
Old Posted Aug 19, 2021, 3:58 PM
ShavedParmesanCheese's Avatar
ShavedParmesanCheese ShavedParmesanCheese is offline
Registered User
 
Join Date: Oct 2020
Location: Ontario
Posts: 370
Kitchener + Waterloo (not the region) have under 400,000 and their LRT opened a few years ago
__________________
Ask me about my radioactive materials
Reply With Quote
     
     
  #2344  
Old Posted Aug 19, 2021, 4:44 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
Quote:
Originally Posted by esquire View Post
Very unlikely in the sense of building shared corridors. Even the existing SW BRT (aka the "Blue Line") was originally conceived as a route that would share the CN ROW near Pembina Highway but it was shifted west to a much wider hydro corridor.

Most of the rail corridors are quite narrow and at first glance it seems unlikely that they could accommodate BRT/eventual LRT without very costly means like elevated structures.
Did the city hold talks with CN at any point about the possibility of shifting the CN ROW to the hydro corridor to convert the current ROW beside the Pembina highway to BRT instead? At first glance, the Pembina corridor looks like it would have been far more useful and accessible to riders.
Reply With Quote
     
     
  #2345  
Old Posted Aug 19, 2021, 9:25 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ Not so far as I am aware. I can't imagine that the railways would ever be willing to do such a thing unless the City paid top dollar for their land, which I doubt it's really in the position to.

Pembina is definitely more built up but it is mostly lower density, SFH/single and two-storey commercial type stuff. There are some larger buildings as you get closer to the University of Manitoba but the BRT line already hugs Pembina by the time it gets that far south. It is possible that the dogleg as it is locally known (along the Hydro ROW) could end up being more beneficial to the city if it actually spurs some TOD, which it admittedly hasn't really done yet.
Reply With Quote
     
     
  #2346  
Old Posted Aug 19, 2021, 9:47 PM
Hybrid247 Hybrid247 is offline
Registered User
 
Join Date: Oct 2009
Posts: 1,320
Quote:
Originally Posted by esquire View Post
^ Not so far as I am aware. I can't imagine that the railways would ever be willing to do such a thing unless the City paid top dollar for their land, which I doubt it's really in the position to.

Pembina is definitely more built up but it is mostly lower density, SFH/single and two-storey commercial type stuff. There are some larger buildings as you get closer to the University of Manitoba but the BRT line already hugs Pembina by the time it gets that far south. It is possible that the dogleg as it is locally known (along the Hydro ROW) could end up being more beneficial to the city if it actually spurs some TOD, which it admittedly hasn't really done yet.
Gotchya, thanks for the insight. I would imagine the high voltage power lines would deter TOD in that area, no? Can't imagine many people would want to pay market rates to live beside a hydro corridor.
Reply With Quote
     
     
  #2347  
Old Posted Aug 20, 2021, 2:22 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by esquire View Post
Very unlikely in the sense of building shared corridors. Even the existing SW BRT (aka the "Blue Line") was originally conceived as a route that would share the CN ROW near Pembina Highway but it was shifted west to a much wider hydro corridor.

Most of the rail corridors are quite narrow and at first glance it seems unlikely that they could accommodate BRT/eventual LRT without very costly means like elevated structures.
I am not suggesting adding more rail, but using the existing rail. Ideally, if it could fit another track, it could then be used with heavy rail cars.

Quote:
Originally Posted by thebasketballgeek View Post
That is quite a valid point, but surely it would cost less then building brand new infrastructure that we’ve been doing for BRT that already possesses elevated structures.

Also, it doesn’t necessarily have to be a shared corridor either and could be just an alternative source of public transportation to the existing/future BRT lines. This could then provide more coverage of public transportation to Manitobans in a more efficient manner.

Either way it’s up to CN if they’re ever willing to move out of Winnipeg proper which I venture is highly unlikely in the foreseeable future.
It isn't just CN, it is CP as well.
https://rac.jmaponline.net/canadianrailatlas/
Zoom in and they both have the corridors. moving their yards might be possible, but it is also the rail corridors that would be important.
Reply With Quote
     
     
  #2348  
Old Posted Aug 20, 2021, 2:23 AM
swimmer_spe swimmer_spe is offline
BANNED
 
Join Date: Apr 2014
Posts: 10,743
Quote:
Originally Posted by Coldrsx View Post
Edmonton's LRT opened in 1978 with a population of 478,000.
Quote:
Originally Posted by ShavedParmesanCheese View Post
Kitchener + Waterloo (not the region) have under 400,000 and their LRT opened a few years ago
So, that means that Winnipeg is primed for it.
Reply With Quote
     
     
  #2349  
Old Posted Aug 20, 2021, 3:28 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Hybrid247 View Post
Gotchya, thanks for the insight. I would imagine the high voltage power lines would deter TOD in that area, no? Can't imagine many people would want to pay market rates to live beside a hydro corridor.
Good question... I assume no residential development would take place right on the hydro corridor, but plenty of people do live near hydro corridors in Winnipeg... whatever plans are hatched for TOD would probably be similar in that regard.

Hydro has moved the lines around to accommodate big-box development on the other side of the CN line north of Taylor Ave., so I guess that's a possibility too.
Reply With Quote
     
     
  #2350  
Old Posted Aug 23, 2021, 6:23 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Ottawa Confederation Line Stage 2 progress.

East-end. Place d'Orleans, Jeanne d'Arc station and Montreal stations, along with the Gloucester High School overpass (near the current terminus of Blair) are at various stages of visible progress.

Video Link


Partial west-end. Moodie to Lincoln Fields progress. Significant foundation work at Lincoln Fields. Flyovers at split well advanced. Ongoing trench work at Queensview. Steel structure going up at Moodie Yards. Lots of digging everywhere else. Bayshore is the only station with little progress as they want it fully functional as long as possible.

Video Link
Reply With Quote
     
     
  #2351  
Old Posted Aug 23, 2021, 6:26 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Inside and outside of future Trillium Stadler FLIRT fleet.




https://twitter.com/JimWatsonOttawa/status/1428783346008662019
Reply With Quote
     
     
  #2352  
Old Posted Aug 26, 2021, 6:28 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,076
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #2353  
Old Posted Sep 1, 2021, 9:11 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,076
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #2354  
Old Posted Sep 3, 2021, 1:00 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,892
Rails installation has begun along the east alignment of the Confederation Line extension.


https://mobile.twitter.com/JimWatsonOttawa/status/1433495532777975820

First Stadler FLIRT on its way to Canada.


https://twitter.com/JimWatsonOttawa/status/1433495700839485442

Gladstone Station along Trillium, between Bayview (transfer to Line 1) and Dow's Lake (TOD central, future Civic Hospital) from Rail Fans Discord.

Reply With Quote
     
     
  #2355  
Old Posted Sep 5, 2021, 4:03 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,076
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #2356  
Old Posted Sep 10, 2021, 6:03 PM
Coldrsx's Avatar
Coldrsx Coldrsx is online now
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,076
I REALLY like the look of this new bridge and the trail system/landscaping is very promising.






__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
Reply With Quote
     
     
  #2357  
Old Posted Sep 11, 2021, 12:09 AM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Looks really good.....I'm impressed with most of this line.
Reply With Quote
     
     
  #2358  
Old Posted Sep 11, 2021, 12:29 AM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
There isn't an actual date set for opening of the Valley Line yet is there?
Reply With Quote
     
     
  #2359  
Old Posted Sep 11, 2021, 2:12 AM
Black Star Black Star is offline
BANNED
 
Join Date: Jun 2010
Location: Edmonton
Posts: 7,259
Quote:
Originally Posted by ue View Post
There isn't an actual date set for opening of the Valley Line yet is there?
They say Dec 2021...92% complete. About a year behind schedule or so. The goal post keep moving daily....weekly....monthly = bad management from contractors and the City Of Edmonton. Surprise surprise.
Reply With Quote
     
     
  #2360  
Old Posted Sep 11, 2021, 2:45 AM
ue ue is offline
BANNED
 
Join Date: Apr 2009
Location: WPG
Posts: 9,493
Ah, ok. Yeah, I only keep seeing "by the end of 2022" and am getting anxious to ride the new rails.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 3:20 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.