HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction


270 Park Avenue in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • New York Skyscraper Diagram

• Map Location
• New York Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
  #1561  
Old Posted Jan 14, 2020, 1:43 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
A look at how 270 Park sits above the railyard and new station below...

















Last edited by NYguy; Jan 14, 2020 at 2:02 AM.
Reply With Quote
     
     
  #1562  
Old Posted Jan 14, 2020, 6:58 PM
JMKeynes JMKeynes is offline
 
Join Date: Aug 2017
Posts: 4,177
Where did you get the images from, specifically, the schematic of the tower? I'm curious because that schematic, which initially came from JPMC's own materials, corresponds to the model that Yimby posted.
Reply With Quote
     
     
  #1563  
Old Posted Jan 15, 2020, 2:49 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Quote:
Originally Posted by JMKeynes View Post
Where did you get the images from, specifically, the schematic of the tower? I'm curious because that schematic, which initially came from JPMC's own materials, corresponds to the model that Yimby posted.
Those are just MTA graphics, which they use in their reports, specifically Eastside Access.




JANUARY 14, 2020






Reply With Quote
     
     
  #1564  
Old Posted Jan 15, 2020, 3:30 AM
JMKeynes JMKeynes is offline
 
Join Date: Aug 2017
Posts: 4,177
Thanks
Reply With Quote
     
     
  #1565  
Old Posted Jan 15, 2020, 8:23 AM
Visionist's Avatar
Visionist Visionist is offline
 
Join Date: Sep 2019
Posts: 248
Can anybody say how much has been shaved off the building so far? Hard to tell in pictures.
Reply With Quote
     
     
  #1566  
Old Posted Jan 15, 2020, 6:00 PM
Submariner's Avatar
Submariner Submariner is offline
 
Join Date: Mar 2013
Posts: 1,341
Is anyone working on an illustration for this? I can't wait to see it in the diagrams section!!!
Reply With Quote
     
     
  #1567  
Old Posted Jan 15, 2020, 9:18 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Quote:
Originally Posted by Visionist View Post
Can anybody say how much has been shaved off the building so far? Hard to tell in pictures.
Didn’t have time to focus on it, but it looks like just a bit off the top. They’ve been mostly removing the insides and the facade.
Reply With Quote
     
     
  #1568  
Old Posted Jan 15, 2020, 9:25 PM
Zerton's Avatar
Zerton Zerton is offline
 
Join Date: Mar 2002
Posts: 4,608

Officespace.com - 4 Embarcadero Center, San Francisco. Completed 1982

The shape is kind of late '70s / '80s imo. But I like it. What's old is new again. It looks classic.
Reply With Quote
     
     
  #1569  
Old Posted Jan 15, 2020, 10:37 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Quote:
Originally Posted by Zerton View Post

Officespace.com - 4 Embarcadero Center, San Francisco. Completed 1982

The shape is kind of late '70s / '80s imo. But I like it. What's old is new again. It looks classic.

Classic in a sense, but this one will come loaded with so many amenities and a striking facade that classic wouldn’t be the first thing that comes to mind. The new Park Avenue meets the old.
Reply With Quote
     
     
  #1570  
Old Posted Jan 15, 2020, 10:49 PM
JMKeynes JMKeynes is offline
 
Join Date: Aug 2017
Posts: 4,177
Quote:
Originally Posted by Zerton View Post

Officespace.com - 4 Embarcadero Center, San Francisco. Completed 1982

The shape is kind of late '70s / '80s imo. But I like it. What's old is new again. It looks classic.
It's a similar idea, but JPMC's setbacks are far taller and more pronounced. It will be extremely iconic.
Reply With Quote
     
     
  #1571  
Old Posted Jan 17, 2020, 3:41 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
http://a810-bisweb.nyc.gov/bisweb/JobsQu...passjobnumber=140883836&passdocnumber=01

Quote:
01/16/2020

DEMOLISH PORTIONS OF CONCRETE SLAB AT SUBCELLAR-2 LEVEL TO CREATE ACCESS FOR D1 LINE CONSTRUCTION, FILED SEPARATELY UNDER DOB #121204810.

CONCRETE SLAB AND ENCASEMENT SHALL BE DEMOLISHED, BUT STEEL FRAMING AND COLUMN BRACING SHALL REMAIN FOR STRUCTURAL STABILITY. THIS PARTIAL DM NOT REQUIRED FOR TEMP. STABILIZATION.

Reply With Quote
     
     
  #1572  
Old Posted Jan 18, 2020, 3:20 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Another take on 270 (not Foster's)...


https://www.instagram.com/p/B7bGyn-Hx3g/

Reply With Quote
     
     
  #1573  
Old Posted Jan 18, 2020, 5:05 PM
bgsrand bgsrand is offline
 
Join Date: May 2017
Posts: 192
Handsome
Reply With Quote
     
     
  #1574  
Old Posted Jan 21, 2020, 8:12 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Somewhat what we'll see when this tower finally gets to the construction phase...


https://vintagemanhattanskyline.tumblr.com/page/5







And a throwback to construction...



Last edited by NYguy; Jan 21, 2020 at 8:26 PM.
Reply With Quote
     
     
  #1575  
Old Posted Jan 22, 2020, 5:49 AM
Amanita's Avatar
Amanita Amanita is offline
 
Join Date: Apr 2003
Posts: 2,235
Not even gonna lie, that shot of 277 Park Avenue is sweet, thanks!
Reply With Quote
     
     
  #1576  
Old Posted Jan 22, 2020, 6:01 AM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
Quote:
Originally Posted by Amanita View Post
Not even gonna lie, that shot of 277 Park Avenue is sweet, thanks!
You get to see how massive the tower is, but doesn't even compare in scale with the new 270.



Reply With Quote
     
     
  #1577  
Old Posted Jan 22, 2020, 10:20 AM
chris08876's Avatar
chris08876 chris08876 is offline
 
Join Date: Jul 2013
Posts: 49,413
Look how thin 1 Vandy looks in comparison.
Reply With Quote
     
     
  #1578  
Old Posted Jan 22, 2020, 10:29 PM
Amanita's Avatar
Amanita Amanita is offline
 
Join Date: Apr 2003
Posts: 2,235
Another interesting thing about both the current 270 and 277 Park Avenue is how it looks like they both have tails, after a fashion. Building codes required setbacks still, but architectural fashion was changing, so you ended up with the setbacks moved to the back and sides, creating that "tail" effect.
Reply With Quote
     
     
  #1579  
Old Posted Jan 23, 2020, 7:54 PM
Visionist's Avatar
Visionist Visionist is offline
 
Join Date: Sep 2019
Posts: 248
Whereas now the new building will use that entire base and soar straight up, with setbacks, to almost twice the height of the old building.

That is seriously insane to ponder.

And right next door, Travelstead Tower was supposed to rise, an impressive 1080' but would have been dwarfed by what's going up here now. That would have been quite the sight.
Reply With Quote
     
     
  #1580  
Old Posted Jan 23, 2020, 8:16 PM
NYguy's Avatar
NYguy NYguy is offline
 
Join Date: Jul 2001
Posts: 57,298
All made possible through zoning. The city could have done this long ago, but the need wasn't as urgent.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Supertall Construction
Forum Jump



Forum Jump


All times are GMT. The time now is 10:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.