I will. Yes "above grade" and the emphasis on "start to see"
I feel like an astronaut sent to orbit the planet mars and take pictures in a spacecraft with no windows, the camera is strapped to the outside of the vehicle.
I'm witnessing the progress like you all are...Only in pictures.
Graham Construction@GrahamBuilds - Dec 19 https://twitter.com/GrahamBuilds/status/1207766939755368448
Parking structure at 1568 Alberni in #YVR is halfway back up to grade! P4 structure is complete & form for P3 deck will be ready for 2020.
Manufacturing of curtain wall has begun with our team inspecting the 1st batch of glazing units #kengokuma #AlbernibyKuma @WestbankCorp
Both temperatures & snow are falling at 1568 Alberni in #YVR but that’s not slowing down the concrete for the P3 Core Pour or the Perimeter Wall Shotcrete. Frost-fighters are on full blast https://twitter.com/GrahamBuilds
I was unable to get my camera above the fortress walls, but here’s a street level shot showing rebar columns for the first level above grade (my pic, today).
Last edited by Otis_Van; Apr 21, 2020 at 10:10 PM.