View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7781  
Old Posted Mar 29, 2017, 3:27 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,787
Quote:
Originally Posted by Reecemartin View Post
Some on the Eglinton Crosstown are also being mined.
I'm no geotechnical engineer, but I've gotta imagine you need pretty solid ground to do that. Bored tunnels maintain their integrity by installing the concrete rings that line the tunnel as boring machine moves, preventing the overburden from collapsing. It's hard for me to imagine having the same opportunity to do that when mining the cavernous space required for a station.
     
     
  #7782  
Old Posted Mar 29, 2017, 4:13 PM
White Pine White Pine is offline
Registered User
 
Join Date: Jan 2010
Posts: 398
Apparently Ottawa's bedrock is pretty shallow in most of the downtown area.
     
     
  #7783  
Old Posted Mar 29, 2017, 9:14 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:29 AM.
     
     
  #7784  
Old Posted Mar 30, 2017, 12:49 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by aberdeen5698 View Post
I'm no geotechnical engineer, but I've gotta imagine you need pretty solid ground to do that. Bored tunnels maintain their integrity by installing the concrete rings that line the tunnel as boring machine moves, preventing the overburden from collapsing. It's hard for me to imagine having the same opportunity to do that when mining the cavernous space required for a station.
The earth under downtown and False Creek was good enough to run the TBM tunnels from Olympic Stn to Waterfront, so I doubt the earth under Broadway is substantially different to prevent using a TBM for the Broadway tunnels too.

As for mining the stations ... I think that's new for Vancouver.
     
     
  #7785  
Old Posted Mar 30, 2017, 1:28 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,787
Quote:
Originally Posted by jsbertram View Post
The earth under downtown and False Creek was good enough to run the TBM tunnels from Olympic Stn to Waterfront, so I doubt the earth under Broadway is substantially different to prevent using a TBM for the Broadway tunnels too.

As for mining the stations ... I think that's new for Vancouver.
I never said that boring a tunnel is an issue. I said that tunnel boring machines insert concrete rings as they go to prevent tunnel collapse - so they're a lot less prone to issues with unstable ground.

I'm saying that mining a station cavity might be problematic unless the ground is very stable, because you don't have those concrete rings to support the overburden.
     
     
  #7786  
Old Posted Mar 30, 2017, 2:07 AM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:29 AM.
     
     
  #7787  
Old Posted Mar 30, 2017, 2:39 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
they take core samples to know what is there. if it is determined that mining stations is the route to go THEN IT IS SAFE TO DO SO; otherwise they wouldn't do it. i don't understand this whole thing with a bunch of armchair engineers being all "oh i don't think that would work; that's not going to work; that's not a good idea; how will that work." well, they have the geotechnical report, they are the engineers, and they have enough information and brain power to determine what is safe and doable.
     
     
  #7788  
Old Posted Mar 30, 2017, 3:01 AM
jollyburger jollyburger is online now
Registered User
 
Join Date: Dec 2015
Posts: 15,665
Quote:
Originally Posted by VancouverOfTheFuture View Post
they take core samples to know what is there. if it is determined that mining stations is the route to go THEN IT IS SAFE TO DO SO; otherwise they wouldn't do it. i don't understand this whole thing with a bunch of armchair engineers being all "oh i don't think that would work; that's not going to work; that's not a good idea; how will that work." well, they have the geotechnical report, they are the engineers, and they have enough information and brain power to determine what is safe and doable.
Isn't that the whole purpose of this forum.. to second guess every architectural, transportation, engineering decision in the city?
     
     
  #7789  
Old Posted Mar 30, 2017, 3:27 PM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,787
Quote:
Originally Posted by VancouverOfTheFuture View Post
they take core samples to know what is there. if it is determined that mining stations is the route to go THEN IT IS SAFE TO DO SO; otherwise they wouldn't do it. i don't understand this whole thing with a bunch of armchair engineers being all "oh i don't think that would work; that's not going to work; that's not a good idea; how will that work."
I'm not questioning any decisions they make, I'm questioning the armchair engineers that say "hey, why don't they just mine it?". If they decide not to mine it, then they have good reasons for doing so. It may be that they consider it more costly, or it may be that the ground isn't suitable.

My main point is that mining may not be possible for Broadway, even though it's perfectly OK to bore a tunnel through it.
     
     
  #7790  
Old Posted Mar 30, 2017, 3:28 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,615
Quote:
Originally Posted by jollyburger View Post
Isn't that the whole purpose of this forum.. to second guess every architectural, transportation, engineering decision in the city?
That and threatening to "start digging ourselves" to get some of these projects going...
     
     
  #7791  
Old Posted Mar 31, 2017, 2:04 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Hey, to the CoV people reading this forum ....

I see the CoV owns the former ScotiaBank at Oak & Broadway, and the building next door (a tailor & a restaurant) is up for sale.

Why not grab this property too and merge them. Now you have a large plot to build new 100' tower (along with a Broadway M-Line entrance). The building can have its own access to the M-Line concourse.

Or lease the large plot to a developer to do the same.
     
     
  #7792  
Old Posted Mar 31, 2017, 4:24 AM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
this line is probably closer to an announcement then we realize. interesting the things the city is doing with this.

Quote:
Originally Posted by jsbertram View Post
That was to get to the 80% engineering complete stage of the project.

This is primarily needed to sharpen the pencils on the cost estimates.

Core samples along the length of the route greatly help to discover what is underground that the TBM will have to dig through - and how expensive that will be.

I've heard the "80% engineering report" is done and being reviewed by everyone involved in the Broadway extension planning
should be interesting to see what the city decides to do about the construction on Broadway and all that traffic being diverted elsewhere.
     
     
  #7793  
Old Posted Mar 31, 2017, 3:26 PM
Ramsay's Avatar
Ramsay Ramsay is offline
Registered User
 
Join Date: Oct 2016
Location: Vancouver
Posts: 59
Sounds like the Provincial gov is going to match the feds commitment..

B.C. government to match federal funding for Broadway SkyTrain Extension, Surrey LRT

http://www.cbc.ca/news/canada/british-columbia
     
     
  #7794  
Old Posted Mar 31, 2017, 4:56 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,509
Quote:
Originally Posted by VancouverOfTheFuture View Post
should be interesting to see what the city decides to do about the construction on Broadway and all that traffic being diverted elsewhere.
I seem to recall the city doing SFA about traffic alternates when the Cambie line was undertaken.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #7795  
Old Posted Mar 31, 2017, 4:57 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
Quote:
Originally Posted by Ramsay View Post
Sounds like the Provincial gov is going to match the feds commitment..

B.C. government to match federal funding for Broadway SkyTrain Extension, Surrey LRT

http://www.cbc.ca/news/canada/british-columbia
This is good news, and expected, too, since the NDP has announced their intention to adopt a 40%/Federal matching approach to transit funding.

When the do tender for the SkyTrain Broadway Extension and the Surrey LRT line, I hope that it is a combined RFP so that a single builder is responsible for both. If the folly of the Surrey LRT line is about to be committed to, at least we can realize some cost savings from the efficiencies of running the two projects as a single endeavor.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
  #7796  
Old Posted Mar 31, 2017, 6:15 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
This is really predictable. I remember saying that it wouldn't surprise me if we got a provincial funding commitment in April/May 2017.
__________________
In the heart of a busy metropolis skyscrapers are a vivid reminder of the constant yearning of the human spirit to rise to God
     
     
  #7797  
Old Posted Mar 31, 2017, 6:58 PM
Reecemartin's Avatar
Reecemartin Reecemartin is offline
YouTube Creator
 
Join Date: Sep 2015
Location: Vancouver/Toronto
Posts: 1,776
[Deleted]

Last edited by Reecemartin; Nov 18, 2020 at 1:29 AM.
     
     
  #7798  
Old Posted Mar 31, 2017, 8:46 PM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by Jebby View Post
This is really predictable. I remember saying that it wouldn't surprise me if we got a provincial funding commitment in April/May 2017.
I believe most on this forum were saying 'that' while you were still believing that the Canada line was operating at under capacity and stating the Broadway extension is not needed.
     
     
  #7799  
Old Posted Mar 31, 2017, 9:27 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by Reecemartin View Post
Hmm, seems like it would be more natural to have them as seperate projects, what if there was a funding issue etc, it might mean both get delayed.
They are separate RFP's, therefor they are going to be completely separate projects. That is how this PPP nonsense works.
     
     
  #7800  
Old Posted Mar 31, 2017, 11:04 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,694
My logic for having the two projects combined is that the combined dollar value of the project(s) would make it a globally significant RFP and we would likely get more bidders from outside of Canada (and the US), driving down costs and likely attracting parties who do this stuff more often.

There would also be efficiencies to be gained: soft costs on the engineering and architectural side of things; one concrete precast plant; one rail order, etc.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:54 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.