HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Reply

 
Thread Tools Display Modes
     
     
  #1721  
Old Posted Nov 16, 2016, 4:06 AM
Finessing Finessing is offline
Registered User
 
Join Date: Jun 2015
Posts: 122
Syndicated mortgage payments delayed
http://www.mortgagebrokernews.ca/news/syndicated-mortgage-payments-delayed-217108.aspx

Fortress not paying investors on this Calgary project with Lamb.

...is anybody surprised?
Reply With Quote
     
     
  #1722  
Old Posted Nov 17, 2016, 4:20 AM
Flatland Metropolis's Avatar
Flatland Metropolis Flatland Metropolis is offline
Registered User
 
Join Date: Oct 2013
Location: East Kildonan, Winnipeg
Posts: 308
Reply With Quote
     
     
  #1723  
Old Posted Nov 17, 2016, 6:53 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Tidbit from Twitter.

Detailed design is kicking into 5th gear this morning with a meeting on windows, roof & balcony details (aka "cladding" in builder speak)!
https://twitter.com/SkyCityWinnipeg/status/799323579510702080

Reply With Quote
     
     
  #1724  
Old Posted Nov 17, 2016, 8:44 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Another tidbit.

This baby gonna be a beauty! Materials have been spec'd as we move towards construction in the spring #livedowntown #ownthesky @FortressRDI
https://twitter.com/SkyCityWinnipeg/status/799348741316734976

Reply With Quote
     
     
  #1725  
Old Posted Nov 17, 2016, 9:20 PM
optimusREIM's Avatar
optimusREIM optimusREIM is online now
There is always a way
 
Join Date: May 2014
Location: Winnipeg
Posts: 3,262
Well they certainly make the project look legit. Fingers crossed this goes ahead on schedule.
Reply With Quote
     
     
  #1726  
Old Posted Nov 17, 2016, 9:44 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,881
A spring 2017 construction start seems reasonable. Looks as though the drawings are well under way. Those architectural plans show some heavy concrete walls - so someone is thinking about or already thought out some major building structure.

Could be interesting if it happens where SkyCity and 300 Main are being built up at about the same time.

I think 300 Main will obviously go up quicker, but it's time as "tallest" may be short lived.
Reply With Quote
     
     
  #1727  
Old Posted Nov 17, 2016, 10:05 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
That thing is a damned collossus. A beautiful collossus, however. I'm not sure it registers with many just how MASSIVE that podium is... far larger than a typical highrise podium, it seems, since the sheer height of the tower + fin distracts from its base.

I love the design and I really hope this moves forward.

Quote:
Originally Posted by drew View Post
A spring 2017 construction start seems reasonable. Looks as though the drawings are well under way. Those architectural plans show some heavy concrete walls - so someone is thinking about or already thought out some major building structure.

Could be interesting if it happens where SkyCity and 300 Main are being built up at about the same time.

I think 300 Main will obviously go up quicker, but it's time as "tallest" may be short lived.
I'd imagine that 300 will go up a whole 10-12 months faster, which remains a tragically short time with that "tallest" claim.

Although not nearly as similar, my guess is that the Sutton towers may be rising at the same time/rate as SkyCity, however.
Reply With Quote
     
     
  #1728  
Old Posted Nov 17, 2016, 10:25 PM
lilwayne lilwayne is offline
Registered User
 
Join Date: Mar 2012
Posts: 757
Thier well over 200 units sold at this point it's moving forward projects fail all the time but this one seems to be a sycesss
Reply With Quote
     
     
  #1729  
Old Posted Nov 17, 2016, 10:27 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
I really like the white with dark accents. Although some will say more colour, which is true. However, I think it looks quite good. Hopefully it turns out as nice as the renders. Not like ALT.. I don't see any stucco here, so should be alright.
Reply With Quote
     
     
  #1730  
Old Posted Nov 17, 2016, 10:34 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
I want more color, but this tower will be decent.
Reply With Quote
     
     
  #1731  
Old Posted Nov 18, 2016, 12:50 PM
OakbluffMB OakbluffMB is offline
Registered User
 
Join Date: Jun 2015
Posts: 33
I wonder how they'll be able to keep the white metal panels clean?

I love the idea of a stark white tower for sure.
Reply With Quote
     
     
  #1732  
Old Posted Nov 18, 2016, 2:08 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
^ It will be such a contrast from the ocean of beige that currently characterizes our skyline.

I really love the podium and how it addresses the street... it's such a sea change from the 70s/80s residential towers that might have had, at most, a convenience store or small restaurant at the base. This is excellent. I realize it's a common sight in the 3 or 4 biggest cities in Canada, but this kind of thing is very rare here.
Reply With Quote
     
     
  #1733  
Old Posted Nov 18, 2016, 3:16 PM
Urban recluse Urban recluse is offline
BANNED
 
Join Date: Oct 2015
Posts: 4,797
I agree Esq. A tall white tower smack dab in the middle of downtown will almost be a beacon, kind of like FCP was in Toronto for so many years. It will certainly detract impact of the ugly Radisson.
Reply With Quote
     
     
  #1734  
Old Posted Nov 18, 2016, 6:07 PM
Ando Ando is offline
Registered User
 
Join Date: Nov 2014
Posts: 1,723
I have to say I'm kind of flabbergasted by the amount of optimism about this project getting done. I like it and I hope it happens, just don't feel that certain about it.
Reply With Quote
     
     
  #1735  
Old Posted Nov 18, 2016, 8:13 PM
esquire's Avatar
esquire esquire is offline
Registered User
 
Join Date: Oct 2001
Posts: 37,480
Quote:
Originally Posted by Ando View Post
I have to say I'm kind of flabbergasted by the amount of optimism about this project getting done. I like it and I hope it happens, just don't feel that certain about it.
The whole thing seemed so pie in the sky (pun intended) when it was first announced... it still seems so improbable... I mean, why dump all that money and time into it when it could have leveraged a greater return in a bigger city? But with so many units being sold and apparently much of the design work complete, it's starting to feel real.

I didn't think it would get off the ground and I'll happily eat crow when it happens, but I'm not sure I'm 100% convinced that it will.
Reply With Quote
     
     
  #1736  
Old Posted Nov 18, 2016, 8:14 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by lilwayne View Post
Thier well over 200 units sold at this point it's moving forward projects fail all the time but this one seems to be a sycesss
I appreciate your enthusiasm for this project, so don't get me wrong, but I've mentioned it a billion times...

They've pre-sold 200, I'm assuming, and that means nothing from a success standpoint. When you sell condos, you make money on the last 10% of the units, if that. Money coming in before that is just covering costs. This project is not a success until they've sold over 360+ of the 388 units. It's going to be a grind to sell the last 100 units.

However, it likely IS getting built. A project can still get built and fail. I hope it doesn't, because I want that downtown density to increase and to push up condo prices.

Quote:
Originally Posted by OakbluffMB View Post
I wonder how they'll be able to keep the white metal panels clean?

I love the idea of a stark white tower for sure.
Rain?

Quote:
Originally Posted by Ando View Post
I have to say I'm kind of flabbergasted by the amount of optimism about this project getting done. I like it and I hope it happens, just don't feel that certain about it.
This right here.
Reply With Quote
     
     
  #1737  
Old Posted Nov 18, 2016, 8:36 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,272
Rain makes everything dirty. Pulls the particles out of the air. In our office downtown, everything starts of nice and clean in the spring after windows are cleaned. When it rains, streaks are everywhere. Also pushes around the dirt that's already stuck to the windows. Anywho..
Reply With Quote
     
     
  #1738  
Old Posted Nov 18, 2016, 9:06 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,003
I've heard they are into full working drawings...pretty amazing.
Reply With Quote
     
     
  #1739  
Old Posted Nov 18, 2016, 9:07 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,003
2013 job number on those drawings...ha ha.
Reply With Quote
     
     
  #1740  
Old Posted Nov 18, 2016, 9:20 PM
Wolf13 Wolf13 is offline
Registered User
 
Join Date: Apr 2016
Posts: 1,664
Quote:
Originally Posted by bomberjet View Post
Rain makes everything dirty. Pulls the particles out of the air. In our office downtown, everything starts of nice and clean in the spring after windows are cleaned. When it rains, streaks are everywhere. Also pushes around the dirt that's already stuck to the windows. Anywho..
Lol, I was joking.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 4:49 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.