10 York, is gonna take a good long while to get to ground level. Honestly, it might not get to ground level by the fall, just based on the rate of progress over the past fall and winter.
10 York, is gonna take a good long while to get to ground level. Honestly, it might not get to ground level by the fall, just based on the rate of progress over the past fall and winter.
I'd expect that they'd be able to go at a faster pace during the spring and summer than over the winter.
Keep in mind that the top half is residential, ie. much less slab to slab height.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish
260 meters confirmed would put it at the top of this list, and put it there for a good long time. I don't see One Bloor, One Yonge or Mirvish starting in the next 2 to 3 years to be honest.
Towers waiting in the batting deck:
45 Bay - 254 meters (Spring 2015)
Eau du Soliel - 216 meters (May 2015)
216 meters "barely" makes the list when and if it does happen
Sorry caltrane, I meant to say One Bloor West is supposed to start late this year so the retail portion can open late 2017. I wish One Yonge would start though because it will have the largest impact on our skyline from the lake.