Old Posted Feb 25, 2015, 3:01 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,981
Quote:
Originally Posted by untitledreality View Post
My office has had bids/projections come back at similar levels, often from contractors who do not have a wealth of experience working on complicated facade systems, or because of a few rather pricey specifications that slipped through the cracks.
well, in my 15 years of construction administration, i've never seen preliminary pricing come back 90% over the total projected budget for a project. yes, often there have been particular pieces of a given project that have unexpectedly come back WAY out of line with our cost projections, but never 90% over for the whole enchilada.

then again, i've never worked on anything close to a $900M (or is it $1.7B?) supertall skyscraper, so perhaps that whole world is very different.
__________________
"Missing middle" housing can be a marvelous middle ground for many middle class families.
Reply With Quote
     
     
  #562  
Old Posted Feb 25, 2015, 3:07 PM
ChiTownWonder's Avatar
ChiTownWonder ChiTownWonder is offline
Registered User
 
Join Date: Jun 2014
Location: New Orleans
Posts: 618
Where did this 90% over budget come from anyways? I still find that hard to believe
Reply With Quote
     
     
  #563  
Old Posted Feb 25, 2015, 3:31 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,981
Quote:
Originally Posted by ChiTownWonder View Post
Where did this 90% over budget come from anyways?
pilsenarch. go back and reread the last 20 or so posts in this thread.

he has proven himself to have insider info on this project in the past.

so, while it's not exactly gospel, it's not coming out of nowhere either.
__________________
"Missing middle" housing can be a marvelous middle ground for many middle class families.

Last edited by Steely Dan; Feb 25, 2015 at 3:44 PM.
Reply With Quote
     
     
  #564  
Old Posted Feb 25, 2015, 7:43 PM
rlw777 rlw777 is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,792
Quote:
Originally Posted by Steely Dan View Post
pilsenarch. go back and reread the last 20 or so posts in this thread.

he has proven himself to have insider info on this project in the past.

so, while it's not exactly gospel, it's not coming out of nowhere either.
I know he has proven himself to have insider info but I also find it hard to believe that the estimate for this design is twice what it cost to build Trump.
Reply With Quote
     
     
  #565  
Old Posted Feb 25, 2015, 8:26 PM
intrepidDesign's Avatar
intrepidDesign intrepidDesign is offline
Windy City Dan
 
Join Date: Apr 2008
Location: Chicago
Posts: 508
Sorry, I'm too lazy to go back, but I thought the building was 90% funded, not over budget. Am I remembering this incorrectly?
Reply With Quote
     
     
  #566  
Old Posted Feb 25, 2015, 9:10 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,981
Quote:
Originally Posted by intrepidDesign View Post
Sorry, I'm too lazy to go back, but I thought the building was 90% funded, not over budget. Am I remembering this incorrectly?
if you're too lazy to reread the last 22 posts in this thread, than you shall remain in the dark.

the conversation about this project being over-budget starts at post #544.
__________________
"Missing middle" housing can be a marvelous middle ground for many middle class families.

Last edited by Steely Dan; Feb 25, 2015 at 9:25 PM.
Reply With Quote
     
     
  #567  
Old Posted Feb 25, 2015, 11:23 PM
XIII's Avatar
XIII XIII is offline
Registered User
 
Join Date: Jan 2012
Location: Chicago
Posts: 284
Quote:
Originally Posted by Steely Dan View Post
pilsenarch. go back and reread the last 20 or so posts in this thread.

he has proven himself to have insider info on this project in the past.

so, while it's not exactly gospel, it's not coming out of nowhere either.
A bit of Gang bashing in the history too...

I appreciate any contribution, but offer a reminder to take things with a grain of salt on these forums...
__________________
"Chicago would do big things. Any fool could see that." - Ernest Hemingway
Reply With Quote
     
     
  #568  
Old Posted Feb 25, 2015, 11:36 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,981
^ true. no one should ever venture into any webforum without copious amounts of salt grains.
__________________
"Missing middle" housing can be a marvelous middle ground for many middle class families.
Reply With Quote
     
     
  #569  
Old Posted Feb 26, 2015, 1:32 AM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NY - Cali
Posts: 6,688
Quote:
Originally Posted by Steely Dan View Post
^ true. no one should ever venture into any webforum without copious amounts of salt grains.

Yea, don't believe everything you hear, although on one hand I wouldn't be surprised at all (judging from Chicago's history with supertall proposals) if they decided to cut costs and build a well shorter box.

On the other hand, it seems unfathomable that the people behind this would go 90% over budget, you would think they would know what they're doing and to make sure that a design released to the public fit said budget.

Quote:
I know he has proven himself to have insider info but I also find it hard to believe that the estimate for this design is twice what it cost to build Trump.
It does seem a little odd, they're about the same height but Trump's design is much simpler and less complex. But still, double?
Reply With Quote
     
     
  #570  
Old Posted Feb 26, 2015, 2:06 AM
ChiTownWonder's Avatar
ChiTownWonder ChiTownWonder is offline
Registered User
 
Join Date: Jun 2014
Location: New Orleans
Posts: 618
Quote:
Originally Posted by Zapatan View Post
It does seem a little odd, they're about the same height but Trump's design is much simpler and less complex. But still, double?
yea kinda hard to believe. 1.7 billion is a lot for a building like this. maybe like 1-1.2 billion?
Reply With Quote
     
     
  #571  
Old Posted Feb 26, 2015, 3:25 PM
pilsenarch pilsenarch is offline
Registered User
 
Join Date: Dec 2006
Posts: 894
ok, the exact # turns out to be closer to 1.6 billion, so closer to 80% but still a shocker... maybe it has something to do with a team with very little experience in designing such a structure? again, most of the $ overage is associated with the structure itself, which, of course, is not adding anything to the stability or function of the project... so I would guess the form of the building is going to change drastically, or it is finished with horrible detailing, and/or the form becomes a mere shadow of what it is now, although I'm not sure that wouldn't be better :-)

Last edited by pilsenarch; Feb 26, 2015 at 5:45 PM.
Reply With Quote
     
     
  #572  
Old Posted Feb 26, 2015, 9:42 PM
ChiTownWonder's Avatar
ChiTownWonder ChiTownWonder is offline
Registered User
 
Join Date: Jun 2014
Location: New Orleans
Posts: 618
so im thinking same massing and height, but no zig zag sides. god im nervous for a new rendering
Reply With Quote
     
     
  #573  
Old Posted Feb 26, 2015, 10:14 PM
Steely Dan's Avatar
Steely Dan Steely Dan is offline
devout Pizzatarian
 
Join Date: Jul 2001
Location: Lincoln Square, Chicago
Posts: 29,981
Quote:
Originally Posted by ChiTownWonder View Post
so im thinking same massing and height, but no zig zag sides. god im nervous for a new rendering
i think i might have found a new rendering of the redesign.



__________________
"Missing middle" housing can be a marvelous middle ground for many middle class families.

Last edited by Steely Dan; Feb 26, 2015 at 11:01 PM.
Reply With Quote
     
     
  #574  
Old Posted Feb 26, 2015, 10:17 PM
wierdaaron's Avatar
wierdaaron wierdaaron is offline
Registered User
 
Join Date: Nov 2012
Location: Chicago
Posts: 2,012
Maybe the same massing, but instead of steel and glass the whole thing will be brutalist poured concrete with MCF style windows.
Reply With Quote
     
     
  #575  
Old Posted Feb 26, 2015, 11:56 PM
CHI -21c CHI -21c is offline
Chicago 21st Century
 
Join Date: Jul 2014
Location: Chicago
Posts: 31
They should ditch the zigzag design.

It's so expensive and loud, yet it's not even beautiful or creative. Everyone called it cartoony, an "architectural one-liner," tacky, Dubai/Chinese-esque.

They should keep:
height
scale
straddling N Field Blvd
different hues of glass

Start over with a sophisticated, serious, sharp design.
Reply With Quote
     
     
  #576  
Old Posted Feb 27, 2015, 12:28 AM
pilsenarch pilsenarch is offline
Registered User
 
Join Date: Dec 2006
Posts: 894
^ Thank you.
Reply With Quote
     
     
  #577  
Old Posted Feb 27, 2015, 12:38 AM
untitledreality untitledreality is offline
Registered User
 
Join Date: Sep 2011
Posts: 1,043
Quote:
Originally Posted by HomrQT View Post
In your experience when those initial high cost projections come in, how much of the original design/intentions tend to change to compensate for the overages?
It is entirely case by case. It will depend on what came back with the largest overrun, what competing bids are available, whether the client's initial program was simply too much for their budget, whether the client decides to increase their budget... there really is no way to tell without seeing a full breakdown of the cost projections and understanding what is important to the client.

Our office have had project budgets increased by 30% to get the design they prefer constructed, while we have also had clients nit pick every last component of a project to whittle down that last remaining 5% overage.

Never for a billion dollar project however. We typically operate in the $75-400mm range for larger structures.
Reply With Quote
     
     
  #578  
Old Posted Feb 27, 2015, 2:46 AM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NY - Cali
Posts: 6,688
Quote:
ok, the exact # turns out to be closer to 1.6 billion, so closer to 80% but still a shocker... maybe it has something to do with a team with very little experience in designing such a structure? again, most of the $ overage is associated with the structure itself, which, of course, is not adding anything to the stability or function of the project... so I would guess the form of the building is going to change drastically, or it is finished with horrible detailing, and/or the form becomes a mere shadow of what it is now, although I'm not sure that wouldn't be better :-)

Aren't these people supposed to be professionals? I guess not...
Reply With Quote
     
     
  #579  
Old Posted Feb 27, 2015, 3:29 AM
Ryanrule Ryanrule is offline
BANNED
 
Join Date: Sep 2013
Posts: 771
being at the top of your industry rarely correlates with massive amounts of competence.
Reply With Quote
     
     
  #580  
Old Posted Feb 27, 2015, 3:30 AM
Gantz Gantz is offline
Registered User
 
Join Date: Mar 2013
Posts: 746
Quote:
Originally Posted by rlw777 View Post
I know he has proven himself to have insider info but I also find it hard to believe that the estimate for this design is twice what it cost to build Trump.
Trump was constructed 6 years ago, before the housing crisis. I don't know about Chicago, but just within the past year alone construction costs in NYC went up by 25-30%.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 10:35 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.