View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #6421  
Old Posted Dec 7, 2014, 11:14 PM
SOSS SOSS is offline
Registered User
 
Join Date: Jan 2014
Posts: 661
When they do these 'averages' they should remove the outliers. It would make the numbers a little bit better. Not by much though since each implementation of each type of technology is unique.
     
     
  #6422  
Old Posted Dec 8, 2014, 12:00 AM
quobobo quobobo is offline
Registered User
 
Join Date: Jan 2008
Location: Vancouver
Posts: 1,053
Quote:
Originally Posted by milomilo View Post
Maybe some small European cities it costs that, but in big expensive western cities subways always cost a crap ton. London's newest 'metro' (Crossrail) line is ~$25-30 billion.
Read the link again. London and New York are both outliers with costs >= $1B/km.

There are plenty of big expensive first-world cities on that list that are much cheaper, including Paris, Tokyo, and Singapore.
     
     
  #6423  
Old Posted Dec 8, 2014, 5:16 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
The other thing that skews many of the projects at the top of that list is the length.

East Side Access is super short, but has an absolutely gigantic station cavern excavated under Grand Central Station. There isn't much distance to dilute the cost of that in a per km basis.

The Central Subway in San Francisco is also similar, not a long tunnel but the number of stations drives up the cost per km. Light Rail Trains and their pantrographs mean the tunnel has to be taller and is subsequently more expensive.

Acquiring and launching a tunnel boring machine is also a fairly fixed cost compared to most construction items. So if you dilute this with more km per TBM then you get lower costs. Projects like Crossrail with more TBMs also mean that fixed (ish) cost is multiplied, but overall the timeline of the project ends up shorter.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #6424  
Old Posted Dec 9, 2014, 3:55 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by quobobo View Post
Read the link again. London and New York are both outliers with costs >= $1B/km.

There are plenty of big expensive first-world cities on that list that are much cheaper, including Paris, Tokyo, and Singapore.
Interesting, I didn't realise it could go so cheap, although we do have to trust his numbers (we could simplify the costs for Calgary's West LRT and say it cost ~$2B per km of tunnel). As another poster mentioned, there are often good reasons for the high cost - in London it is due to huge stations threaded between many tube lines etc.

The scale of these projects is often enormous - and they have to be because that is what is required to get value for money. Cheaping out is always regretted in the long term.

What sort of costs are likely for new subways in Toronto, I seem to remember it being fairly expensive?
     
     
  #6425  
Old Posted Dec 11, 2014, 9:31 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Title updated to: Broadway Millennium Line Extension | Proposed
     
     
  #6426  
Old Posted Dec 11, 2014, 10:23 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
The referendum question was released today:


[I]https://twitter.com/jeffnagel/status/543118555382702080/photo/1

Anybody else notice that "Arbutus" isn't mentioned in the Broadway subway extension? I don't think that's to be taken lightly. Hopefully they find a way to get it all the way to UBC. I doubt it means it could go shorter than Arbutus though, since it was in the Mayor's plan.
     
     
  #6427  
Old Posted Dec 17, 2014, 8:39 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,741
From Vancouvermarket.ca:
(whose pic shows the corner at Cypress, not Arbutus)

Quote:
Translink Acquires West Broadway Corner Lot

Posted on December 17, 2014

Translink has acquired a 50 ft. lot at the corner of West Broadway and Arbutus Street for $6,250,000, or $370 per buildable SF based on the current C-3A zoning which permits a density of 3.0 FSR. The 2-storey retail and office building on the site has holding income.


...

http://www.vancouvermarket.ca/2014/12/17/translink-acquires-west-broadway-corner-lot/

Seems like an odd location.

Halfway between Arbutus and Burrard, and not on the south (closer to 10th Ave), either.

     
     
  #6428  
Old Posted Dec 17, 2014, 8:44 PM
squeezied's Avatar
squeezied squeezied is offline
Registered User
 
Join Date: Jul 2006
Location: Vancouver, BC
Posts: 1,625
This property wouldn't be for the station right? I thought the Pinnacle development at the southeast corner of West Broadway and Arbutus had a provisional space for a future station.
     
     
  #6429  
Old Posted Dec 17, 2014, 8:52 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,741
Quote:
Originally Posted by squeezied View Post
This property wouldn't be for the station right? I thought the Pinnacle development at the southeast corner of West Broadway and Arbutus had a provisional space for a future station.
Yes, it does.
I suppose it could be for vent shaft and /or substation - but that would also suggest the line would be under Broadway itself, rather than 10th Ave.
     
     
  #6430  
Old Posted Dec 17, 2014, 9:03 PM
Kwik-E-Mart Kwik-E-Mart is offline
A.H.-Ha!
 
Join Date: Mar 2008
Location: Cambie Village, Van City
Posts: 348
Will this officially confirm that the platform is between Cypress and Arbutus? If so, then the station serves Burrard Street quite well.
     
     
  #6431  
Old Posted Dec 17, 2014, 10:17 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by GlassCity View Post
The referendum question was released today:


[I]https://twitter.com/jeffnagel/status/543118555382702080/photo/1

Anybody else notice that "Arbutus" isn't mentioned in the Broadway subway extension? I don't think that's to be taken lightly. Hopefully they find a way to get it all the way to UBC. I doubt it means it could go shorter than Arbutus though, since it was in the Mayor's plan.
You are absolutely right! Considering that Broadway itself doesn't go all the way to UBC and yet the document specifically says "along Broadway" and nowhere else. Very reassuring indeed that the Broadway Line will NOT extend all the way for those self entitled UBC students...
     
     
  #6432  
Old Posted Dec 17, 2014, 10:29 PM
Vin Vin is offline
Registered User
 
Join Date: Sep 2013
Posts: 8,738
Quote:
Originally Posted by officedweller View Post
Yes, it does.
I suppose it could be for vent shaft and /or substation - but that would also suggest the line would be under Broadway itself, rather than 10th Ave.
The line itself could be under 10th Ave but the station entrances on the Broadway side. A short 1-block underground passage can link the entrance to the line.
     
     
  #6433  
Old Posted Dec 17, 2014, 10:35 PM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
Maybe necessary for the terminus of the bus to UBC? It'll be one heck of a bus loop.
     
     
  #6434  
Old Posted Dec 17, 2014, 11:39 PM
officedweller officedweller is online now
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,741
Quote:
Originally Posted by Vin View Post
The line itself could be under 10th Ave but the station entrances on the Broadway side. A short 1-block underground passage can link the entrance to the line.
Yeah, but then a parcel on the south side of Broadway would have been more desirable to hedge bets, as it is closer to 10th Ave. The one purchased is on the north side.
     
     
  #6435  
Old Posted Dec 18, 2014, 1:17 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
Quote:
Originally Posted by queetz@home View Post
You are absolutely right! Considering that Broadway itself doesn't go all the way to UBC and yet the document specifically says "along Broadway" and nowhere else. Very reassuring indeed that the Broadway Line will NOT extend all the way for those self entitled UBC students...
As a UBC student you're not gonna get me to agree with you. It's the third highest employment area in the province, and let me tell you I'd much rather spend the 3 hours a day I spend on a bus, studying. It is far less entitled for such an enormous destination to ask for rapid transit that would relieve virtually every major east-west route in the city, than for places like Surrey who have very low density yet feel insulted that they don't have rapid transit lines all over.
     
     
  #6436  
Old Posted Dec 18, 2014, 1:34 AM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by GlassCity View Post
As a UBC student you're not gonna get me to agree with you. It's the third highest employment area in the province, and let me tell you I'd much rather spend the 3 hours a day I spend on a bus, studying. It is far less entitled for such an enormous destination to ask for rapid transit that would relieve virtually every major east-west route in the city, than for places like Surrey who have very low density yet feel insulted that they don't have rapid transit lines all over.
So basically, you want the local, provincial and federal taxpayers, many of whom live in Surrey and have been paying already high taxes but getting little in return, to finance the $3 billion dollars worth of transit so that *you* will be able to save "three hours" of time in the bus? And perhaps instead of spending hours upon hours in this forum talking nonsense, perhaps you should spend that time studying instead?
     
     
  #6437  
Old Posted Dec 18, 2014, 2:13 AM
dleung's Avatar
dleung dleung is offline
Registered User
 
Join Date: Nov 2009
Location: Toronto
Posts: 6,554
^^That $3 billion will be better spent than on any other transit project in the country. Can have this conversation again when Surrey has a transit ridership corridor above 100,000ppd
     
     
  #6438  
Old Posted Dec 18, 2014, 3:11 AM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is offline
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,205
Quote:
Originally Posted by queetz@home View Post
So basically, you want the local, provincial and federal taxpayers, many of whom live in Surrey and have been paying already high taxes but getting little in return, to finance the $3 billion dollars worth of transit so that *you* will be able to save "three hours" of time in the bus? And perhaps instead of spending hours upon hours in this forum talking nonsense, perhaps you should spend that time studying instead?
Perhaps they're a planning student or architect. Personally I just worked very hard in the summers and lived cheaply in Point Gray.
__________________
"It's ok, I'm an engineer!" -Famous last words
     
     
  #6439  
Old Posted Dec 18, 2014, 3:21 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by queetz@home View Post
So basically, you want the local, provincial and federal taxpayers, many of whom live in Surrey and have been paying already high taxes but getting little in return, to finance the $3 billion dollars worth of transit so that *you* will be able to save "three hours" of time in the bus? And perhaps instead of spending hours upon hours in this forum talking nonsense, perhaps you should spend that time studying instead?
I don't see all that much difference between that and asking everyone outside of Surrey to pay for their LRT system...

That having been said, it makes sense to me that UBC itself should chip in something to merit a UBC extension, rather like YVR did.
     
     
  #6440  
Old Posted Dec 18, 2014, 3:27 AM
libtard's Avatar
libtard libtard is offline
Dahvie Fan
 
Join Date: Aug 2012
Posts: 1,310
Fingers crossed this never gets built. Metro Van is already blanketed in public transit options. Time for our highway network to catch up
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 2:49 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.