Simple, smooth, not obtrusive at all. I like it.

Thanks MTL, this must be the first glimpse we get of the future Outremont buildings ever!
Reply With Quote
     
     
  #1142  
Old Posted Nov 29, 2011, 5:28 AM
G.S MTL's Avatar
G.S MTL G.S MTL is offline
MTL♥
 
Join Date: Jan 2003
Location: Montreal
Posts: 2,495
BTW altoria is actually 35 floors .... i didnt know they increased from 32 to 35! cool stuff
__________________
Montreal, Pearl of Canada.
Population: 4.5 Million
Reply With Quote
     
     
  #1143  
Old Posted Nov 29, 2011, 10:58 PM
digitboy's Avatar
digitboy digitboy is offline
digital b0y
 
Join Date: Aug 2003
Location: Rimouski
Posts: 3,635
I love the exclusive SSP Stuff
__________________
immobilism :

a political policy characterized by inertia and antipathy to change
Reply With Quote
     
     
  #1144  
Old Posted Nov 30, 2011, 12:43 AM
Rico Rommheim's Avatar
Rico Rommheim Rico Rommheim is offline
Look at me!
 
Join Date: Jun 2007
Location: City of Bagels
Posts: 13,911
Quote:
Originally Posted by G.S MTL View Post
BTW altoria is actually 35 floors .... i didnt know they increased from 32 to 35! cool stuff
Yeah that was several months ago!
Reply With Quote
     
     
  #1145  
Old Posted Nov 30, 2011, 9:25 PM
lake of the nations's Avatar
lake of the nations lake of the nations is offline
Utilisateur enregistré
 
Join Date: Aug 2010
Location: Sherbrooke
Posts: 2,044
Voici probablement l'une des plus grosse annonces privées des dernières années!!! (j'admet toutefois que ça perd un peu de crédibilité quand on regarde le promoteur, il s'agit du même qui est derrière le «projet» de 60 étages à Laval et qui est à l'origine du scandale des Îles de Boucherville)

Publié le 30 novembre 2011 à 12h41 | Mis à jour à 15h23
Un tunnel entre la Rive-Sud et l'île Notre-Dame?

Le pont de la Concorde vers Montréal. PHOTO ARCHIVES LA PRESSE

La Presse Canadienne

Alors que la région de Montréal connaît des problèmes de congestion sans précédent, un entrepreneur se lance dans la mêlée avec un projet de lien routier pour relier la Rive-Sud au centre-ville.

Luc Poirier, surtout connu dans le secteur immobilier, a proposé mercredi de construire, en deux ans à peine, un tunnel à péage entre la route 132 à Saint-Lambert et l'île Notre-Dame.

Le lien permettrait d'accéder au centre-ville par le pont de la Concorde, l'avenue Pierre-Dupuy et l'autoroute Bonaventure. Il serait financé entièrement par des capitaux privés.

Le tunnel passerait sous la route 132, la Voie maritime du Saint-Laurent, le bassin olympique et une partie de l'île Notre-Dame pour aboutir près du Casino de Montréal. Sa longueur serait d'un peu plus d'un kilomètre.

En conférence de presse, M. Poirier a estimé que le projet coûterait «des centaines de millions» de dollars. Il a toutefois refusé de donner une évaluation plus précise afin de ne pas influencer les soumissions des entrepreneurs qui participeraient à un éventuel appel d'offres.

«J'arrive avec un projet qui est rassembleur, qui est gagnant-gagnant pour tout le monde puisque je peux le faire rapidement sans aucuns fonds publics», a-t-il déclaré.

Pour préparer son projet, le promoteur n'a d'ailleurs pas consulté les autorités publiques, que ce soit le ministère des Transport, la Corporation de gestion de la Voie maritime, la Ville de Saint-Lambert ou la Ville de Montréal.

Les deux administrations municipales concernées ont indiqué mercredi qu'elles voulaient en savoir davantage sur l'initiative avant de la commenter.

À l'appui de son projet, Luc Poirier a rendu publiques deux études de la firme d'ingénierie Dessau concluant à sa faisabilité technique.

Selon les projections de Dessau, environ 12 500 automobilistes par jour utiliseraient un éventuel tunnel pendant sa première année d'exploitation et 25 000 à la troisième année.

M. Poirier prévoit que pour emprunter le tunnel, il en coûterait à peu près le même prix que pour le nouveau pont de l'autoroute 25, qui relie Laval à Montréal. Les tarifs de ce dernier oscillent entre 1,80 $ et 2,40 $ par passage, ce à quoi il faut ajouter des frais d'administration de 3 $ à 5 $ pour les véhicules ne possédant pas de transpondeur.

Les autobus scolaires et urbains emprunteraient gratuitement le tunnel. Ce dernier comprendrait également une piste cyclable qui raccourcirait de plus de trois kilomètres le parcours entre les deux rives à partir du centre-ville.

Luc Poirier a révélé mercredi que «deux gros fonds québécois», qu'il n'a pas voulu nommer, sont prêts à se lancer dans l'aventure avec lui. Il a même avancé que sans leur appui, il pourrait financer à lui seul une mise de fonds s'élevant à 15 ou 20 pour cent de la valeur totale du projet.

L'homme d'affaires s'est défendu de vouloir accroître le nombre de voitures qui entrent chaque jour dans l'île de Montréal, soutenant qu'il veut simplement alléger la congestion existante, laquelle risque de croître substantiellement au cours des prochaines années en raison des nombreux travaux routiers prévus dans la région métropolitaine.

«Ce ne sont pas de nouveaux automobilistes, c'est vraiment un déplacement, a-t-il expliqué. Je désengorge les autres ponts pour améliorer la fluidité entre les deux rives.»

M. Poirier a souligné au passage qu'à la différence du trajet Montréal-Laval, aucun nouveau lien routier n'a été construit avec la Rive-Sud depuis 1967.

Deux projets de tunnel, dont un très semblable à celui dévoilé mercredi, avaient été présentés en 2002 devant la Commission de consultation sur l'amélioration de la mobilité entre Montréal et la Rive-Sud, présidée par l'ingénieur Roger Nicolet. Ils sont restés sans suite.

«À l'époque, on n'avait pas les problèmes de congestion qu'on a aujourd'hui», a fait remarquer Luc Poirier.

Aucune étude de rentabilité du projet n'a été présentée mercredi. Dans son étude de préfaisabilité technique, Dessau note que le tunnel ne pourra pas voir le jour avant la conclusion de «plusieurs ententes (...) entre Investissement Luc Poirier et les différents intervenants».

http://www.cyberpresse.ca/actualites/reg...berpresse_B4_manchettes_231_accueil_POS2
Reply With Quote
     
     
  #1146  
Old Posted Nov 30, 2011, 11:07 PM
lake of the nations's Avatar
lake of the nations lake of the nations is offline
Utilisateur enregistré
 
Join Date: Aug 2010
Location: Sherbrooke
Posts: 2,044
Nouveau centre de transport pour la STM : Une construction «verte» prévue pour 2013

La maquette du nouveau centre de transport Stinson qui sera construit en bordure des rues Stinson et Montpellier.

Publié par Mylène Colmar le 2011-11-28 20:07

Un nouveau centre de transport pour la Société de transport de Montréal (STM) sera construit à partir de juin 2012 dans l'arrondissement Saint-Laurent et devrait être opérationnel d'ici l'automne 2013. Le président du conseil d’administration de la STM, Michel Labrecque, l'adjoint parlementaire du ministre des Transports du Québec Guy Ouellette et le maire de l’arrondissement Saint-Laurent et vice-président du comité exécutif de la Ville, Alan DeSousa, n'ont pas caché leur grande satisfaction, lors de l'annonce qui a eu lieu aujourd’hui après-midi.

« L’implantation du centre de transport Stinson à Saint-Laurent est le catalyseur pour le renouvellement de tout un secteur. (...) (L)’arrivée de centaines de travailleurs aura des retombées économiques positives pour la collectivité. » — Alan DeSousa

Situé près du centre ville, le Centre de transport Stinson consistera en un bâtiment de deux étages, pouvant accueillir 750 employés et abriter 300 bus - 100 articulés et 200 conventionnels. Le budget total du projet s'élève à 165,2 millions de dollars. Le Ministère des transports du Québec a contribué « à ce projet majeur avec une aide financière de plus de 120 millions de dollars, soit 75 % des investissements totaux, en vertu du Programme d'aide au transport collectif des personnes », selon le ministre Pierre Moreau.

Michel Labrecque, le président du conseil d’administration de la STM, a affirmé que le futur centre de transport Stinson sera « le bâtiment le plus écologique de la STM ». Et il a expliqué que : « faire un projet de développement durable ne coûte pas vraiment plus cher si nous le planifions dès le départ. »

La construction devrait respecter la certification LEED, qui est attribuée au bâtiments à haute qualité environnementale, grâce notamment aux espaces verts et boisés, à un système de récupération des eaux de pluie et à son toit végétal qui couvrira 25% de la surface totale.

Photos : Mylène Colmar

http://montreal.openfile.ca/blog/curator...our-la-stm-une-construction-%C2%AB-verte
Reply With Quote
     
     
  #1147  
Old Posted Dec 1, 2011, 12:01 AM
MTLskyline's Avatar
MTLskyline MTLskyline is offline
The good old days are now
 
Join Date: Jun 2006
Location: Montreal
Posts: 4,258
The tunnel would be really convenient for me as I live a few blocks away from where they have it emerging on the south shore.

However, this project will NEVER see the light of day. There are many reasons for this:
1. St. Lambert citizens will refuse this project that will temporarily dig up a park (Seaway Park). They will also be really opposed to all of the extra traffic that will be driving on quiet residential streets. There simply are not any large roads that could handle this type of traffic in St. Lambert (with the exception being Sir Wilfrid Laurier Blvd., but that's where the Victoria Bridge emerges).

2. Most Montrealers will be opposed to digging up Ile Notre-Dame and having cars emerge from it racing across the Concordia Bridge. Parc Jean-Drapeau is Montreal's #2 park, IMO.

3. Luc Poirier sounds to me like a big talker with a short attention span. Remember his 60 floor condo tower proposal for Laval (of all places)? Besides, he is also only a millionaire. I could see this project costing over $1 billion.
Reply With Quote
     
     
  #1148  
Old Posted Dec 1, 2011, 1:53 AM
Alexcaban's Avatar
Alexcaban Alexcaban is offline
Registered User
 
Join Date: Jun 2009
Location: Montreal/Vancouver
Posts: 606
Little update from November 28

Altitude





Altoria





Marriott Courtyard





Concordia GM Building - Recladding







Reply With Quote
     
     
  #1149  
Old Posted Dec 1, 2011, 2:24 AM
Rumors's Avatar
Rumors Rumors is offline
Ciao tutti
 
Join Date: Mar 2008
Location: French Canada.
Posts: 1,120
Great updates did you happen to pass by the Waldorf...I did?
Reply With Quote
     
     
  #1150  
Old Posted Dec 1, 2011, 2:24 AM
mr.John mr.John is offline
Registered User
 
Join Date: Oct 2006
Posts: 2,021
would love to see them recladd complex Desjardins,preferably with a nuclear bomb
Reply With Quote
     
     
  #1151  
Old Posted Dec 1, 2011, 2:29 AM
mr.John mr.John is offline
Registered User
 
Join Date: Oct 2006
Posts: 2,021
Quote:
Originally Posted by Rumors View Post
Great updates did you happen to pass by the Waldorf...I did?
ha ha if you still believe that building will go up then I'm sure your looking forward to Dec.25 when Santa will bring you lots of goodies
Reply With Quote
     
     
  #1152  
Old Posted Dec 1, 2011, 2:39 AM
lake of the nations's Avatar
lake of the nations lake of the nations is offline
Utilisateur enregistré
 
Join Date: Aug 2010
Location: Sherbrooke
Posts: 2,044
Quote:
Originally Posted by mr.John View Post
ha ha if you still believe that building will go up then I'm sure your looking forward to Dec.25 when Santa will bring you lots of goodies
Do you know something we don't or have you been on another planet for the last year? The site preparation has begun a few months ago.
Reply With Quote
     
     
  #1153  
Old Posted Dec 1, 2011, 2:39 AM
MTLskyline's Avatar
MTLskyline MTLskyline is offline
The good old days are now
 
Join Date: Jun 2006
Location: Montreal
Posts: 4,258
The large fire-escape staircase they put behind the Medical Arts Building on Guy Street was being enclosed in brick the last I saw it. (The brick is actually pretty similar to the original brick, but it is lighter in colour).
Reply With Quote
     
     
  #1154  
Old Posted Dec 1, 2011, 2:55 AM
mr.John mr.John is offline
Registered User
 
Join Date: Oct 2006
Posts: 2,021
Quote:
Originally Posted by lake of the nations View Post
Do you know something we don't or have you been on another planet for the last year? The site preparation has begun a few months ago.
are you talking about the same project that was suppose to be built over a decade ago? weren't sales suppose to start this summer? last time I passed by the only thing I saw was a vacant field (unless they're cleverly hiding all the heavy equipment)...watch them start digging next week just to prove me wrong (I wouldn't mind)
Reply With Quote
     
     
  #1155  
Old Posted Dec 1, 2011, 3:04 AM
Rumors's Avatar
Rumors Rumors is offline
Ciao tutti
 
Join Date: Mar 2008
Location: French Canada.
Posts: 1,120
They seem to be working on the Medical Arts building, they've closed in that fire escape,. They have part of the parking lot closed off, somethings going on there. I took a couple of shots while I was there.
Reply With Quote
     
     
  #1156  
Old Posted Dec 1, 2011, 3:22 AM
Rumors's Avatar
Rumors Rumors is offline
Ciao tutti
 
Join Date: Mar 2008
Location: French Canada.
Posts: 1,120
I was at the Bell Centre too, I saw a large piece of plywood covering something on the brick floor.
Reply With Quote
     
     
  #1157  
Old Posted Dec 1, 2011, 3:28 AM
lake of the nations's Avatar
lake of the nations lake of the nations is offline
Utilisateur enregistré
 
Join Date: Aug 2010
Location: Sherbrooke
Posts: 2,044
Quote:
Originally Posted by Rumors View Post
I was at the Bell Centre too, I saw a large piece of plywood covering something on the brick floor.
They must be hiding the broken plates!


Photograph by: John Kenney, The Gazette

MONTREAL - Granite plates marking momentous events in the 100 years of the Montreal Canadiens history have cracked, because of survey work being done in advance of plans to morph Centennial Plaza into a condo project.

Train commuters and hockey fans will be dismayed to see deep cracks in markers like one titled “A New Mark for Maurice” – when the Rocket scored his 325th goal – and “No. 1 Retired Forever,” honouring Jacques Plante’s jersey-retiring ceremony.

Almost a dozen markers in the plaza next to the Bell Centre are broken as a result of geotechnical survey work – including the drilling of bore holes – to test the structural capacity of the soil under the square.

But never fear – the plaques will be fixed.

“Certain granite plaques were damaged, but they will be replaced,” said Donald Beauchamp, vice-president of communications with the Canadiens.

Real-estate developer Cadillac Fairview owns the land housing the plaza as well as several parcels nearby on St. Antoine and Mountain Sts.

In March, the company announced its plan to put up several structures in the area – office towers and three condo towers, two of them on the Centennial Plaza site.

The bronze statues, memorial plaques and hundreds of engraved bricks purchased by hockey fans will not be destroyed or mothballed by the potential construction.

“Our agreement with Cadillac Fairview was to build (Centennial Plaza) on the current location,” Beauchamp said. “In the event they do build, the park would be relocated in the vicinity of the Bell Centre.”

Calls to Cadillac Fairview were not returned.



Read more: http://www.montrealgazette.com/sports/Su...plaques/5792227/story.html#ixzz1fFYnsyYy
Reply With Quote
     
     
  #1158  
Old Posted Dec 1, 2011, 3:40 AM
Rumors's Avatar
Rumors Rumors is offline
Ciao tutti
 
Join Date: Mar 2008
Location: French Canada.
Posts: 1,120
Merci.
Reply With Quote
     
     
  #1159  
Old Posted Dec 1, 2011, 3:58 AM
MTLskyline's Avatar
MTLskyline MTLskyline is offline
The good old days are now
 
Join Date: Jun 2006
Location: Montreal
Posts: 4,258
Bah, it's not like the plaques themselves are historic.They were made 2-3 years ago and can easily be replaced.

The real tragedy was plunking the Bell Centre where they did (which ensured that Windsor Station would no longer serve its intended purpose). It was probably the most short sighted thing done to Montreal since the 1960s or 70s.
Reply With Quote
     
     
  #1160  
Old Posted Dec 1, 2011, 5:54 AM
Rico Rommheim's Avatar
Rico Rommheim Rico Rommheim is offline
Look at me!
 
Join Date: Jun 2007
Location: City of Bagels
Posts: 13,911
Quote:
Originally Posted by MTLskyline View Post
The real tragedy was plunking the Bell Centre where they did (which ensured that Windsor Station would no longer serve its intended purpose). It was probably the most short sighted thing done to Montreal since the 1960s or 70s.
Agreed.

For a city steeped in rich railway history, Montreal has a poor history of building and maintaining railway stations.

Just look at our "Central Station". A soviet shoe factory in all appearance, surrounded by unremarkable midrises, whose entrance is a stunningly ugly parkade (complete with a McDick's sign) on a cold, empty downtown street.

And them they rob Windsor Station and build a pretend-train station.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Québec > Montréal
Forum Jump



Forum Jump


All times are GMT. The time now is 11:55 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.