Originally Posted by Nowhereman1280
Yeah it was there a few weeks ago as well, I wonder why they are testing before they even tear the building down?
|
You want to test before tearing the building down in most cases. Even if you test by drilling from inside the building this is the way to go. This lends general efficiency to the project from the beginning. Engineers will know the composition of the ground beforehand, and can design accordingly based on the tests. This allows time for drawings to be developed before work has to take place. While a demolition permit is attainable without a building permit, there's not much sense in taking a building down without having a project ready to put in its place. A lot of developers these days are buying with general ideas in mind, without knowing if their deals will work or not. So the preference is to leave the building in case they need to just unload the property again. The worst case is likely that they lose a bit in carrying cost.
Then, assuming the project is a go, come construction time, the demolition can be scheduled to roll right through to excavation, so that you avoid the kind of incoherent scheduling that occurred on Barney's, where the buildings were torn down and then the site was filled to grade with brick batt, which subsequently had to be re-excavated anyway.