Quote:
Originally Posted by simcityaustin
It seems that this building is shooting up faster then it's reinforced concrete residential neighbors. Is this the norm for steel highrises?
|
Yep. Both concrete and steel have their 'selling points'. Concrete orders can be executed relatively quickly but that will result in longer construction time. Contrarily, steel fabrication can take a very long time and needs to be ordered well before it's needed. It however, once delivered, does result in faster construction time.