  #21  
Old Posted Dec 20, 2025, 1:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
They have made some progress building the 6th floor concrete block walls but the weather hasn't been much help.
Reply With Quote
     
     
  #22  
Old Posted Jan 3, 2026, 2:06 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
Should have the 6th floor concrete block walls built in the next 2 weeks on this project.

https://www.ctvnews.ca/london/article/a-...housing-project-eyes-early-2027-opening/
Reply With Quote
     
     
  #23  
Old Posted Jan 20, 2026, 7:09 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
Wrapping up the 6th floor concrete block wall builds. Should see the precast concrete roof slabs being installed soon.
Reply With Quote
     
     
  #24  
Old Posted Feb 8, 2026, 8:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
Precast concrete roof slabs now installed on this 6s building. Up next the mechanical penthouse walls. Window units are now installed up to the 3rd floor level.
Reply With Quote
     
     
  #25  
Old Posted Feb 19, 2026, 4:49 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
This is nearly topped out with the mechanical penthouse and elevator/stairwell concrete block walls nearly built. Have started installing the window units upto the 4th floor now.
Reply With Quote
     
     
  #26  
Old Posted Mar 12, 2026, 8:59 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
This 6s building is topped out now. Exterior and interior finishing already under way.
Reply With Quote
     
     
  #27  
Old Posted Jun 6, 2026, 10:10 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
Exterior brick now being installed on the south side.
Reply With Quote
     
     
  #28  
Old Posted Jun 7, 2026, 4:01 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
Reply With Quote
     
     
  #29  
Old Posted Jun 9, 2026, 12:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,884
CTV coverage of tour of this building.


https://www.ctvnews.ca/london/article/look-inside-the-73-unit-affordable-housing-project/


Of note St Vincent is looking for property to build a 2nd building in the city.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 3:57 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.