Old Posted Jun 22, 2021, 3:29 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,784
Quote:
Originally Posted by waterloowarrior View Post
the approved drawings are posted. There is a condition of site plan that they construct a sidewalk along Last Mile
https://devapps.ottawa.ca/en/applica...0-0028/details
That's good. I'm not sure if they will serve this with an extension of route 98 or by re-routing the 47.

The latter seems like it's more likely. An extension of the 98 (at least for some trips) would be nice, but I think they'd need a bus loop somewhere to be able to do that.
Reply With Quote
     
     
  #22  
Old Posted Aug 25, 2022, 12:24 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,631
I thought it had its own thread, but can't find it right now. Steel is up on two buildings at the warehouse district on NCC land at Hunt Club and the 417.
Reply With Quote
     
     
  #23  
Old Posted Sep 1, 2022, 4:13 PM
originalmuffins originalmuffins is offline
Registered User
 
Join Date: Jun 2018
Location: Ottawa
Posts: 877
Ottawa's move to a logistics center for the Quebec-Windsor corridor is a big diversification for our city economy. I for one welcome it, because Ottawa becoming a logistics hub plus being a tech and government centre is huge for growing the city.

And hopefully have some fresher perspectives coming in lol. I like the designs of these warehouses though, should create some life in the area beside Hydro's new HQ.
Reply With Quote
     
     
  #24  
Old Posted Sep 1, 2022, 4:26 PM
YOWflier's Avatar
YOWflier YOWflier is offline
Melissa: fabulous.
 
Join Date: Apr 2005
Location: YOW/CYOW/CUUP
Posts: 3,159
Yes. It’s just too bad we aren’t finding a way to build these facilities on airport grounds so as to fuel the YOW CIP.
Reply With Quote
     
     
  #25  
Old Posted Sep 1, 2022, 5:04 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,296
Would've been nice to build those on the sea of existing industrial lands and parking lots in the area instead.
Reply With Quote
     
     
  #26  
Old Posted Oct 19, 2022, 1:15 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,200
Docs are up for the 2 buildings on "Site 2".

https://devapps.ottawa.ca/en/applica...2-0125/details



Reply With Quote
     
     
  #27  
Old Posted Oct 29, 2022, 8:58 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,200
‘iPhone of industrial buildings’: National Capital Business Park springs to life in the east end

By: Heddy Sorour, OBJ
Oct 28, 2022 2:43pm EDT




Through a creative leasing agreement with the National Capital Commission (NCC), Avenue 31, an Ottawa real estate, development and investment company, is transforming a federally owned 99-acre parcel of land just inside the greenbelt into the National Capital Business Park.

“The rental structure itself isn’t odd for us,” said Bill Leonard, executive director, real estate, for the NCC. “Our leases have a base rental component with a percentage rent share of revenue at the same time; so if our tenants do well, we do well. I guess from a land-lease perspective that’s unique, but I think we are looking to be partners with our tenants and that kind of rental structure does put you right in with your tenant and it allows you to work with them over the length of the lease.”

Well under construction, the state-of-the-art industrial park is clearly visible from Hwy. 417 on the approach to the Hunt Club Road exit. Set off of Hawthorne Road, the site is geared towards logistics, e-commerce and the distribution of goods.

“This is a very unique site because of its size and its location inside the greenbelt, making this land the most visible and accessible industrial land in the city,” said Michel Pilon, president and CEO of Avenue 31.

The first building is complete and already occupied, with demand for the next set of spaces already high.

“We’re attracting a lot of companies in the construction materials business, so Emco (Corporation), Mitten Inc. and FedEx have already taken space and a couple of HVAC companies are on the horizon, we also have a security company on the horizon,” said Pilon.

The building design breaks away from the traditional industrial look for an elegant, colourful, fully automated and AI-capable business park. While some of the design and landscaping elements were recommended by the NCC, Avenue 31 was already on the same page.



“I think one of the really interesting things with Avenue 31 is they embraced the aesthetics and they embraced the sustainability requirements right from the start, which allowed for a very good working relationship to develop the product and bring it to construction,” said Leonard.

According to Pilon, the design was a deliberate effort to get away from the ugly squat buildings that characterize the industry.

“I didn’t want to simply build a series of warehouses, just grey or beige nondescript buildings, which warehouses typically are, and so we thought about tulips — just to be inspired by tulips,” said Pilon.

When Jennifer Murray, vice-president of land development with Avenue 31, presented the team with an image of tulip fields, it formed the basis for the park’s logo and provided inspiration for the architectural elements that set the project apart.

Construction started in the second quarter of 2021 and the first building, with 143,000 square feet of space, is complete and occupied.



“This building is the first of eight planned for the buildout over the next five to seven years, the total of which will comprise more than 1.3 million square feet of Class A industrial space,” said Frank Di Roma, principal with Ware Malcolm, the architectural firm designing the park. “The exterior incorporates bright accent colours from the National Capital Business Park logo, which creates a vibrant aesthetic, while design features include significant clearance heights, exceptional loading facilities, automation and AI capabilities.”

Tenants are embracing the new park and lining up to get into spaces early to maximize the custom-build capacities typical of the industry.

“Getting in at the start gave us the ability to incorporate features suited to our needs,” said Frank Borne, general manager with Emco. “We’ve taken 49,000 square feet. That space includes a trade counter, a showroom and includes office space and collaboration rooms.

“The process has been great. I’d say we’ve had good dialogue with Avenue 31, they pay attention to details. You can tell they are a young and dynamic team that are proud of their project.”

Emco’s needs included 24-foot-wide loading doors, which were incorporated before the company moved in.

Another business that’s moving in is Dustbane Products Ltd., a company that has called Ottawa home since 1908.

“After a careful review of potential sites, the (business park) was the clear choice to be our new home in the summer of 2023,” said Ben Merkley, president of Dustbane. “The site’s ideal location (with) access for trucking and the 417 highway was a significant factor. We were most impressed with the quality and efficiency of the design and construction of the buildings along with the overall site plan.”

The location at the edge of the city has FedEx Express Canada leasing 68,000 square feet within the park.

“The facility is strategically located in an important market for our operations,” said James Anderson, communications advisor with FedEx Express Canada.

Once complete, the park will boast green roofs and 324 per cent tree canopy coverage, or 2,400 trees, as well as a green energy microgrid.

“Two of the comments we’ve received so far: one was it’s very unlike Ottawa and the other was it feels and looks like the iPhone of industrial buildings,” said Pilon.

https://www.obj.ca/article/real-esta...-business-park
Reply With Quote
     
     
  #28  
Old Posted Oct 29, 2022, 10:02 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,869
'iPhone of industrial buildings?'???

So, it's proprietary, breaks easily, is three years behind the competition in features, and overpriced?
__________________
Instagram: https://www.instagram.com/the.harleydavis/
Reply With Quote
     
     
  #29  
Old Posted Dec 7, 2022, 11:07 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,252
Last Mile Drive is now open (video in link)
https://www.linkedin.com/posts/aveth...048807936-LiIm
Reply With Quote
     
     
  #30  
Old Posted Jan 30, 2023, 4:04 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,131
What are the companies using those new Russell Road warehouses?
Reply With Quote
     
     
  #31  
Old Posted Jan 25, 2024, 10:26 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,200
Reply With Quote
     
     
  #32  
Old Posted May 7, 2025, 8:17 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,200
Tenants are active in Ottawa-area industrial market: Avenue 31
Firm preparing its 680-acre Camino inland port property; building for new tenants at two other sites

Don Wilcox, RENX
Apr. 4 2025


<snip>

In Ottawa, Avenue 31 is constructing its fourth building at the National Capital Business Park along Hwy. 417. The 200,000-square-foot building is the largest so far at the property, which will comprise about 1.1 million square feet of space at full buildout.

The three existing buildings are almost fully leased, with just one 38,000-square-foot end unit remaining available. Avenue 31 filled two other vacancies in those buildings in the fall.

It started construction on the new building only after securing a pre-lease for 120,000 square feet of the space, which is to be delivered in October.

“There’s a lot of inbound calls that we have been receiving,” Semple said. “We’ve had site visits every day this week, active tenants in the market, some coming in from the Province of Quebec.”

The park still has space for two additional buildings of approximately 200,000 square feet apiece, as well as a 45,000-square-foot crossdock facility. Avenue 31 is in talks with a potential tenant for the crossdock.

A few kilometres east along Boundary Road, adjacent to a million-square-foot Amazon distribution centre, Avenue 31 is developing a building and outdoor industrial storage facility for IAAI, an auto salvage and auction operation owned by Ritchie Brothers. The firm has signed a 20-year lease for the 38-acre site and will move in from a smaller nearby property later this year.

Finally, Avenue 31 is moving to rezone property along Moodie Drive near Fallowfield Road in west Ottawa, near the community of Barrhaven. The 30-acre site offers proximity to quarries and other light industrial uses in the area, as well as Hwy. 416 which connects Ottawa to the Hwy. 401 corridor.

“It’s obviously growing down in that node. We like the land, we like the site. It’s close proximity to the highway, like all our sites,” Semple said. “There’s not a lot of industrial development in the area. There have been land positions taken on the other side of the 416, but there has not been development to date.”

https://renx.ca/active-tenants-in-ot...rket-avenue-31
Reply With Quote
     
     
  #33  
Old Posted May 7, 2025, 9:10 PM
ponyboycurtis's Avatar
ponyboycurtis ponyboycurtis is offline
Cigritbutt enthusiast
 
Join Date: Apr 2021
Location: Blahttawa
Posts: 1,468
I can tell you building D from Hunt Club approaching the onramps looks absolutely massive. Absolutely dwarves C,E and B.

Wonder if it will have a splash of color like the buildings facing the highway. It's honestly a nice little touch when you goto exit SB 417 at Hunt Club.
__________________
I don't understand how communism works.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 9:08 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.