  #221  
Old Posted Jun 22, 2024, 3:00 AM
Williamoforange's Avatar
Williamoforange Williamoforange is offline
Registered User
 
Join Date: Sep 2020
Location: Ottawa
Posts: 833
They posted the panels, not half bad design on a quick glance....It might actually be better then Rockcliffe, but will have to wait for density mapping & ROW widths.....though I'd rather see this on the Greenbelt research farm then way out in the boonies.

https://www.tewin.ca/news-events/
Reply With Quote
     
     
  #222  
Old Posted Jun 22, 2024, 1:24 PM
Jay31 Jay31 is offline
Registered User
 
Join Date: Jul 2022
Location: Ottawa
Posts: 73
Quote:
Originally Posted by OTownandDown View Post
What I'd really like to know is if this is an actual planned community or just several hundred sh*tty townhouses on curvy streets?
I assume this is because people who buy in the suburbs want to feel like they live in the suburbs - that is, streets that have very little traffic because the roads are so windy that the only reason you would drive there is because you live there. I assume this is valued more than walkability and being near transit hubs. Some developers put shortcut walking paths between properties to help, but not always....and it doesn't help the fact that most properties will not be close to transit. It's what people want though.

Of course, the further out you build to satisfy the demand for suburban living, the higher the infrastructure costs...and the more ongoing maintenance cost, which politically, we're not willing to make property owners eat. Thus, politicians keep giving what voters want, even though it's financially unsustainable, and the city's infrastructure rots from the inside outward.
Reply With Quote
     
     
  #223  
Old Posted Jun 24, 2024, 1:12 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,195
Tewin land project doesn't add up, and it's not just about cost
Bruce Deachman says Tewin is paying for city staff to work on its development proposal. That's odd — and raises questions beyond how taxpayer dollars are spent.

Bruce Deachman, Ottawa Citizen
Published Jun 24, 2024 • Last updated 3 hours ago • 4 minute read


The Tewin development consumed much of the discussion at city hall last Thursday, as a joint planning and environment committee accepted the city’s $2-billion Infrastructure Master Plan, which will govern how Ottawa manages drinking water, sewers and stormwater runoff in the coming decades.

And no wonder there was so much discussion. Tewin has never made economic sense for the taxpayer. Close to $590 million will be spent servicing the water needs of the development, a contentious 445-hectare satellite community to be built near Carlsbad Springs that was proposed by a partnership between the Algonquins of Ontario and Taggart Investments. It was approved and adopted into the city’s official plan by the last council in 2021.

Of that amount, just over half, or about $313 million, will come from Tewin, with another $97 million or so covered by development charges. The city could be on the hook for about $160 million, a big ask of taxpayers given that city staff, when it was initially looking at where urban expansion should take place, determined that the Tewin land was too far away from the urban area and didn’t score high enough to even warrant a thorough assessment. Before approving the city’s plan, the province also questioned the Tewin project, noting it didn’t appear to align with some of the city’s goals, including creating 15-minute communities and developing close to rapid transit.

Even the ameliorating notion that expanding the city’s boundaries and approving Tewin was an act of Indigenous reconciliation is questioned by other Algonquin Nations, who say that it wasn’t reconciliation and that they weren’t consulted.

Regardless, it’s shaping up to be too expensive a project, reconciliation or no, and the city should explore ways of expanding instead to some of the West Carleton/March lands that scored much higher on staff assessments and are closer to existing infrastructure.

Meanwhile, the nighttime clear-cutting of 70 hectares of trees by Tewin a year ago, which Taggart first defended as necessary to clean up after the derecho, then subsequently added it was allowed in order to enable farming on the property, was an unsavoury event, even though the city agreed it had the right to do it.

Another questionable aspect was revealed Thursday: Tewin is funding the salaries and benefits of three senior city staff members whose responsibilities are solely to work on the Tewin project.

According to a September 2022 memorandum of understanding between the city and Tewin, a community designer, transportation planner and infrastructure planner — all employees of the city — are paid for by Tewin. Additionally, the memorandum notes that with regard to the latter two positions, “If the City is unable to hire a new dedicated Senior FTE … the Tewin Landowners will fund an outside consultant to fulfil these responsibilities.”

Additionally, if parts of the work plans of the latter two positions require outside consultants, Tewin will fund those, too, and their contracts will be subject to Tewin’s approval.

This project smells like a fish market on a hot day.

Questioned Thursday by Knoxdale-Merivale Coun. Sean Devine, city staff said that such hiring was not common practice and they were unaware of any similar arrangements at the city. Further pressed by Devine, staff said that city management would be unable to reassign any of the three to different files if it wanted, making it easy to wonder if they really fit the definition of city employees.

I asked the city’s media office for an explanation, but none came by my deadline.

It’s possible there’s nothing untoward here. Perhaps Tewin just writes the cheques and the three employees go about their business unaware that it’s a developer, not taxpayers, footing their salaries. The optics, however, are terrible, and the perceived impropriety of having a developer pay the salaries of city employees working on their projects is a black mark against both Tewin and the city.

Meanwhile, Capital Coun. Shawn Menard proposed a motion to have staff determine what the Master Plan costs would be if Tewin were removed from the equation. The motion narrowly failed, but the 9-8 outcome suggests that not everyone is comfortable with the burden Tewin will add to taxpayers’ bills. (Conversely, you could argue it also shows a reluctance to re-open this can of worms.) Bear in mind, the cost figure is even before roads and transit to service the development are calculated and factored in.

The joint committee’s approval of the master plan isn’t a financial commitment on the part of the city, and, according to the legal counsel, there’s no financial risk if the city changes it. According to Kitchissippi Coun. Jeff Leiper, there remain off-ramps from the deal if councillors choose to take them.

They ought to at least consider doing so, as these and other costs come to light. For while I understand the reluctance to relitigate decisions made by previous councils, a point made Thursday by Stittsville Coun. Glen Gower, it’s equally the responsibility of elected officials to re-evaluate the city’s path as details and costs become clearer. Too many questions remain about Tewin to simply forge ahead.

[email protected]

https://ottawacitizen.com/news/local...t-cost-opinion
Reply With Quote
     
     
  #224  
Old Posted Jun 24, 2024, 4:33 PM
stolenottawa stolenottawa is offline
Registered User
 
Join Date: May 2019
Posts: 125
Quote:
Originally Posted by rocketphish View Post
[B][SIZE="4"]
Another questionable aspect was revealed Thursday: Tewin is funding the salaries and benefits of three senior city staff members whose responsibilities are solely to work on the Tewin project.

According to a September 2022 memorandum of understanding between the city and Tewin, a community designer, transportation planner and infrastructure planner — all employees of the city — are paid for by Tewin. Additionally, the memorandum notes that with regard to the latter two positions, “If the City is unable to hire a new dedicated Senior FTE … the Tewin Landowners will fund an outside consultant to fulfil these responsibilities.”

Additionally, if parts of the work plans of the latter two positions require outside consultants, Tewin will fund those, too, and their contracts will be subject to Tewin’s approval.
Ugh, WTF?
Reply With Quote
     
     
  #225  
Old Posted Jun 24, 2024, 5:25 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,415
Quote:
Originally Posted by stolenottawa View Post
Ugh, WTF?
Not sure what's wrong with this. It looks bad but choosing this for inclusion was the shady decision after that of course there is a lot of work needed. It could be joint marketed as a Montreal suburb it's so far from Ottawa.
Reply With Quote
     
     
  #226  
Old Posted Jun 24, 2024, 5:29 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by YOWetal View Post
Not sure what's wrong with this. It looks bad but choosing this for inclusion was the shady decision after that of course there is a lot of work needed. It could be joint marketed as a Montreal suburb it's so far from Ottawa.
People keeping saying this but it's closer to downtown than Kanata is.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
Reply With Quote
     
     
  #227  
Old Posted Jun 24, 2024, 7:02 PM
stolenottawa stolenottawa is offline
Registered User
 
Join Date: May 2019
Posts: 125
Quote:
Originally Posted by YOWetal View Post
Not sure what's wrong with this. It looks bad but choosing this for inclusion was the shady decision after that of course there is a lot of work needed. It could be joint marketed as a Montreal suburb it's so far from Ottawa.
Don't disagree.

I'm guessing the people who will defend the optics of this on council will be the same ones who poopooed the optics of the developer ward donations (which also looked bad.)

I just finished reading The Power Broker and it's shocking how little things change, you see the same types of tactics used in Ottawa and Ontario that Robert Moses used in New York. It's clearly different but the patterns are there.

I suppose it's part of the cost of getting things done...but it always has to be done on the cheap here in Ottawa. Which ends up being expensive long term.
Reply With Quote
     
     
  #228  
Old Posted Jun 25, 2024, 3:06 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,610
From the presentation on their website:



https://www.tewin.ca/news-events/
Reply With Quote
     
     
  #229  
Old Posted Jun 25, 2024, 3:45 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,195
Great. 4 neighbourhoods that you have to drive (or bus) between to accomplish your 15-minute neighbourhood tasks.
Reply With Quote
     
     
  #230  
Old Posted Jun 25, 2024, 9:54 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,598
If we have a main street, what is the chance that we include BRT on that corridor or will it just be another car based plan with token transit. There will be zero chance that we include effective transit from Day 1.
Reply With Quote
     
     
  #231  
Old Posted Jun 25, 2024, 10:05 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,415
Quote:
Originally Posted by rocketphish View Post
Great. 4 neighbourhoods that you have to drive (or bus) between to accomplish your 15-minute neighbourhood tasks.
Yeah there is going to be a bus betwenn nodes

We can barely build not suburban housing somewhere like Oblates land where still the ground based housing sells first. This is obviously a 2-3 car per family development.
Reply With Quote
     
     
  #232  
Old Posted Jun 25, 2024, 10:36 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,598
We know that this whole idea will be blown away when neighbouring land is also developed and it just becomes another suburb and the original concept goes out the window. I am old enough to remember that Kanata had special design features when it was first developed, and has later became watered down with each subsequent phase. Just like Greenboro, which was never copied into other adjacent Hunt Club neighbourhoods. Everybody loved these special design features except subsequent developers who can make more money with cookie cutter traditional suburban designs focused on autos rather than people.
Reply With Quote
     
     
  #233  
Old Posted Jul 5, 2024, 1:58 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,195
Ottawa Council meekly agrees to a spending plan for Tewin that doesn't make sense
Randall Denley says that by supporting big bucks for the Tewin area, councillors are backing into a long-term development priority without looking at the alternatives.

Randall Denley, Ottawa Citizen
Published Jun 26, 2024 • Last updated Jun 26, 2024 • 3 minute read


At times, Ottawa Council has a disconcerting lack of ability to see the big picture or to understand the relationship between cost and value.

Case in point, this week councillors passed the city’s new master plan for water and sewer services. Nearly $600 million of the $1.5 billion plan is attributable to Tewin, a proposed new satellite suburban community out near Carlsbad Springs in rural south-east Ottawa.

Included in that amount is nearly $170 million that city staff have suggested spending to make the main sewer pipes to Tewin far larger than the community of 16,500 people will require by 2046. It’s the smart move, you see, because eventually the vacant land around Tewin might become the home to 93,000 people. Not now, not 20 years from now, but possibly by the end of the century. In effect, councillors are willing to spend your money now because it might, potentially, benefit some other people long after most of us are dead.

Planning enthusiasts will recognize Tewin as being one of the oddest planning decisions ever made by the City of Ottawa. Back in 2021, councillors were just about to approve the Official Plan, the city’s long-term planning document, when then-mayor Jim Watson championed the idea of adding 450 hectares of land that hadn’t even been evaluated by city staff.

The ostensible reason for doing so was that the Algonquins of Ontario owned part of the land, so it was a chance for Indigenous reconciliation. Other Algonquin leaders were skeptical of the deal.

At least the project came with a saving grace. The Algonquin group and their partners, development powerhouse Taggart Group, said they would pay the substantial costs of extending services to Tewin. They are keeping their side of the bargain, agreeing to pay an estimated $313 million in water and sewer capital costs.

That was the original deal, but now city bureaucrats have turned it into a money pit with their grandiose plan to speculate on future sewer demand for land that isn’t even in the city’s Official Plan. That was the point where councillors should have said, “Hey, wait a minute. What do we get for all that money?”

Instead, most councillors chose the path of least resistance at Tuesday’s meeting, going along with the staff plan without questioning its underlying assumption that the area around Tewin has suddenly gone from obscurity to red-hot prospect.

Coun. Shawn Menard was one of the few who understood that a new development needs to be considered based on its costs to the city versus those of other potential developments. That’s the big picture here.

What was at issue is not revisiting the Tewin decision, as some councillors argue, but determining where the city will grow in the future. By supporting big bucks for the Tewin area, councillors are backing into a long-term development priority without looking at the alternatives. There is no shortage of them.

In an effort to jump-start housing in Ottawa, in 2022 the provincial government added 654 hectares of development land to the city’s Official Plan, most of it extending existing suburbs. Last year, the government got in a flap over the provincial Greenbelt controversy around Toronto and withdrew the land. The potential is still there and most, if not all of that development, would make more sense than even more housing around Tewin.

Councillors keen to make an excuse for not limiting Tewin costs now say that can still be done in the future. It could, but the more times the city says yes to a big new development in the southeast, the less likely it is to ever say no.

At some point, making a priority of the area around Tewin will be justified by the number of studies and decisions the city has already made. You can bet $170 million on it.

Randall Denley is an Ottawa journalist and author. Contact him at [email protected]

https://ottawacitizen.com/opinion/ot...-sense-opinion
Reply With Quote
     
     
  #234  
Old Posted Jan 9, 2025, 2:38 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,195
Tewin: Open house offers public first glimpse at proposed development
When complete, the community will have approximately 15,000 homes built around a central "main street" in southeast Ottawa.

Blair Crawford, Ottawa Citizen
Published Jan 09, 2025 • Last updated 2 hours ago • 3 minute read




It will be years before there are shovels in the ground, but the public is now receiving its first look at what the controversial Tewin development in southeast Ottawa might be.

Artist renderings of the project, a three-way partnership between the Algonquins of Ontario and developers Taggart and Caivan, show views of a sleek mix of high-density housing, commercial buildings, with abundant trees, trails and parkland and a striking “Tewin Community Centre” serving as a hub.

When complete, the community will have approximately 15,000 homes built around a central “main street” with easy access to public transit, says Craig Lametti, an urban planner with Toronto-based Urban Strategies Inc.

“Tewin really is an opportunity — a bold and exciting opportunity, in my opinion — to build homes for around 35,000 people. In a place like Ottawa, that will play a significant role in solving the housing-supply problem,” Lametti said.

The project is large enough that planners will be able to co-ordinate the delivery of transit, infrastructure and services in a “walkable, sustainable community,” he said.

“We don’t get that opportunity very often. We work on projects across Canada and globally. It’s not every day you get to work on projects this scale, that can bring all of those things together.”

The Tewin development (Tewin means “home” in Algonquin”) was first proposed in 2020 and approved in 2021 by a previous city council under former mayor Jim Watson. It is to be built near the intersection of Boundary Road and Highway 417 on an 450-hectare, inverted L-shaped parcel of land.

But the project has been controversial. The land scored poorly in the city’s rating system for development, supplying services will be costly and the involvement of the Algonquins of Ontario has been criticized as more of a lucrative land deal than a real act of reconciliation.

Then, in 2023, there was outrage at a massive clearcutting of trees on the site, something the developers said was needed because of damage from the May 2022 derecho.

Lametti pointed out the tree-cutting didn’t occur within the Tewin study area and, regardless, the Tewin plans had been profoundly shaped through Indigenous input.

“We did a walking tour of the site with Indigenous knowledge-keepers and elders and we talked about, ‘What are the significant pieces of the study area?'” he said. “And one of the pieces that came up was the importance of water to the Algonquin community and about how we could find ways to showcase it.

“You know how we are in cities: We tend to throw it (water) in a pipe and put it underground and be done with it. One of the things we’re focusing on is bringing it up and highlighting the water systems in the community so they’re ever-present.”

Every street in Tewin will connect to parkland or pathways, Lametti said.

“We’re very excited about those characteristics that have been focused on making it possible for people, through their day to day living, to experience their natural systems. We’re really trying to make that a part of the community itself.”

The developers are also committed to creating a natural land trust adjacent to the community that will protect hundreds of hectares of ecologically significant land and incorporate trails and low-impact recreation opportunities, he said.

The community will be transit-friendly, with 90 per cent of residents living within a five-minute walk of the central “transit spine,” the main street with “fast, frequent and reliable” bus transit. The developers are working with the city on how to connect the community with transit to other areas and the newly opened Trillium Line LRT, Lametti said.

An open house on the development was scheduled for Thursday, Jan. 9, from 6:30 p.m. to 8 p.m. at the Carlsbad Springs Community Centre at 6020 Piperville Rd.

https://ottawacitizen.com/news/tewin...ent-open-house
Reply With Quote
     
     
  #235  
Old Posted Jan 9, 2025, 5:37 PM
zzptichka zzptichka is online now
Registered User
 
Join Date: Dec 2015
Location: Outaouias
Posts: 2,296
This transit-washing trick infuriates me. No, there will never be any "fast, frequent and reliable bus transit" here. Stop lying.
__________________
My aerial Ottawa photos on Flickr 📷
Reply With Quote
     
     
  #236  
Old Posted Jan 10, 2025, 12:44 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,610
The rail line is right there. Private developer could probably convince Doug to throw in a few hundred million to reactivate it to serve this new suburb.
Reply With Quote
     
     
  #237  
Old Posted Jan 10, 2025, 2:52 PM
lrt's friend lrt's friend is online now
Registered User
 
Join Date: Dec 2006
Posts: 12,598
Quote:
Originally Posted by J.OT13 View Post
The rail line is right there. Private developer could probably convince Doug to throw in a few hundred million to reactivate it to serve this new suburb.
The VIA rail line is there. Just double track it and build a train storage facility at Carlsbad Springs, but Doug Ford would add a lane to the 417
Reply With Quote
     
     
  #238  
Old Posted Mar 20, 2025, 12:28 AM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,195
Ottawa councillor wants controversial Tewin development removed from Official Plan

By Katie Griffin, CTV News
Published: March 19, 2025 at 5:08PM EDT


An Ottawa city councillor wants a controversial development to be scrapped from the city’s Official Plan and is calling for broader consultation with a focus on Indigenous communities.

The Tewin development would see about 15,000 homes be built on 445 acres of land near Carlsbad Springs, south of Leitrim Road and north of Thunder Road near Highway 417.

It would also have shops and services for an estimated 35,000 to 45,000 people.

“The entire package is too large, too far and too complicated and too expensive for the city,” said Bay Ward Coun. Theresa Kavanagh. “$591 million is just a rough estimate of what the water and wastewater costs will be. We’re not even talking about transit and roads, et cetera, to go there. So, we have to think about this really hard. Is this the best thing for our city?”

Kavanagh presented a notice of motion to the city’s Planning and Housing Committee on Wednesday.

Among what’s included—the ask to have the project and all references to it removed from Ottawa’s Official Plan and for staff to look at where else in the city the planned development could go.

“We have so much else going on in terms of expansion,” Kavanagh said. “We have other lands that we can look at.”

The project is a partnership between Taggart Group and the Algonquins of Ontario.

“Rooted in Algonquin values and designed for the future, Tewin will be a once-in-a-generation community that sets a new standard for thoughtful, inclusive development,” they said in a statement. “As our country faces a housing crisis, we remain committed to providing our community much-needed homes. Guided by a phased master-planning process, Tewin is moving forward with community involvement, ensuring a future that reflects shared aspirations, sustainable growth, and housing solutions that address today’s and tomorrow’s needs.”

Community groups are also worried about the strain on the city’s finances.

“I think [the notice of motion] really hits a nail on the head with all the issues that come with the Tewin development…not only the consultation issues but just the problems that it’s going to exacerbate that we already have with the city’s financial crisis,” said Marko Miljusevic with Strong Towns Ottawa.

“Just maintaining our current existing infrastructure—not talking about new stuff they’re going to be adding, but just what we have right now—we have no money to continue adding to that. And so, I think a development like this is just going to exacerbate that.”

Kavanagh wants to see more consultation, something she and others said was lacking.

“We have to…look at what we should do to make sure that the proper consultation is done with the broader community but particularly with the First Nations.”

The motion is expected to be tabled at the Planning and Housing Committee in April. If approved, it would go to council for a vote.

https://www.ctvnews.ca/ottawa/articl...official-plan/
Reply With Quote
     
     
  #239  
Old Posted Mar 20, 2025, 1:03 PM
YOWetal YOWetal is offline
Registered User
 
Join Date: Oct 2006
Posts: 7,415
Quote:
Originally Posted by rocketphish View Post
Ottawa councillor wants controversial Tewin development removed from Official Plan

By Katie Griffin, CTV News
Published: March 19, 2025 at 5:08PM EDT


An Ottawa city councillor wants a controversial development to be scrapped from the city’s Official Plan and is calling for broader consultation with a focus on Indigenous communities.
It was a horrible decisions but backtracking now would expose the city to lawsuits probably not just for costs already taken but they might end up on the hook for the whole expected profit and settle for some 9 figure sum.
Reply With Quote
     
     
  #240  
Old Posted Mar 20, 2025, 9:07 PM
Williamoforange's Avatar
Williamoforange Williamoforange is offline
Registered User
 
Join Date: Sep 2020
Location: Ottawa
Posts: 833
Quote:
Originally Posted by YOWetal View Post
It was a horrible decisions but backtracking now would expose the city to lawsuits probably not just for costs already taken but they might end up on the hook for the whole expected profit and settle for some 9 figure sum.
It was a bad decision but Kavanaugh and friends don't have a leg to stand on, it's been 5 years since they declared a housing emergency and were still arguing over whether high rises should be allowed next to tunneys pasture station or other let stations (singing Kavanaugh and get husband fight continuously)

Then there's the issue that this motion is meaningless, the city doesn't have time to be looking where else housing can go, nvm the fact the city already knows that answer including where the urban boundary expansion can be reallocated.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 12:53 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.