1622 Evans Boulevard - two 6s and townhouses (Under Construction)

A site-plan application was filed for the lot at 1622 Evans Blvd, which is in the Summerside subdivision, for two 6-storey apartments buildings (with 124 units) and 50 townhouse units.

This lot is immediately to the south of the large Summerside plaza with the Activity Plex and there are townhouses that were constructed recently further south which you can see behind the large berm when driving on Highbury.

Other than this permit, I can't find any other info about this development. I would think that this is by Drewlo, since they have been constructing the new Summerside phases.





Reply With Quote
     
     
  #2  
Old Posted Jan 20, 2025, 5:46 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
Drewlo has submitted a zoning application for their new proposal in the Summerside subdivision immediately to the south of the large Activity Plex plaza...... interesting that they already filed a site-plan application earlier this month as usually that step comes right after the zoning approval... it looks like they may be eager to start this ASAP

Planning application page: https://london.ca/business-development/p...anning-applications/1622-evans-boulevard

Planning application notice: https://london.ca/sites/default/files/2025-01/OZ-25010-NoticeofAppPPM-1622%20Evans%20Blvd.pdf


Site-plan:




Rendering of apartment building: it is the exact same design as Drewlo's other new low-rise apartment buildings in London (such as the ones going up further south in Summerside off of Bradley, and at Jackson and Commissioners, and in the northeast end at Kilally and Edgevalley).

Reply With Quote
     
     
  #3  
Old Posted Jan 21, 2025, 2:44 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Huge cost savings to reuse the architectural designs and engineering plans in these low rise apartment buildings. Also big savings in sourcing the materials like windows and balcony doors and railings plus all the exterior interior finishes and fixtures. And the work crews have developed experience and history in installing all these products which results in savings in time and better outcomes. Smart strategy on the part of Drewlo.
Reply With Quote
     
     
  #4  
Old Posted Mar 3, 2025, 6:42 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
Just saw an ad from Drewlo promoting a new 89-unit townhouse development called Element, which is a few parcels of land to the south of the proposal posted earlier.

https://www.drewloholdings.com/comingsoon/element

Here is a recent construction shot:




And to the south of that, Ironstone (aka Drewlo) recently constructed another townhouse development called Evans Glen.... which you can see on the left side of the photo above.

https://ironstonecondos.com/communities/evans-glen
Reply With Quote
     
     
  #5  
Old Posted Apr 2, 2025, 4:35 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
City planning staff is recommending that Council approve the zoning changes that would allow for the two six-storey buildings and townhouses.

https://london.ca/sites/default/files/20...-25010%20-%20PEC%20Report%20%28RB%29.pdf

This goes to the planning committee on April 8th and then the Council meeting on April 22nd.
Reply With Quote
     
     
  #6  
Old Posted Apr 24, 2025, 4:18 PM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
City Council approved the zoning changes for the two 6-storey apartment buildings and townhouses.
Reply With Quote
     
     
  #7  
Old Posted Jul 6, 2025, 1:47 AM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
Building permits have been filed for the two apartment buildings:



Reply With Quote
     
     
  #8  
Old Posted Aug 1, 2025, 3:48 AM
CanadianTalk's Avatar
CanadianTalk CanadianTalk is online now
Moderator
 
Join Date: Jun 2021
Location: London, Ontario
Posts: 1,284
Drewlo shared a video update on their social media pages saying that construction has started on the new development here, which they are calling "Mint".

https://www.instagram.com/drewloaptrentals/reel/DMyFXyQRX2N/

https://www.drewloholdings.com/comingsoon/mint

Looks like they are starting with the north 6-storey building (right behind the Activity Plex building)... there will be another 6s building to the south of this, as well as several townhouse blocks.

Reply With Quote
     
     
  #9  
Old Posted Aug 25, 2025, 4:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Making a lot of progress forming and pouring the parking garage foundation and ground floor walls and posts.
Reply With Quote
     
     
  #10  
Old Posted Sep 27, 2025, 7:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
The foundation and L1 walls are now mostly poured for building A. Also working on the parking garage structure with alot of the walls and posts now poured.
Reply With Quote
     
     
  #11  
Old Posted Nov 26, 2025, 8:56 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have started installing the steel modular wall panels for the ground floor on the north 6s building. Also have made alot of progress on the L1 walls of the south 6s building.
Reply With Quote
     
     
  #12  
Old Posted Dec 4, 2025, 4:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have started forming for the 2nd floor slab of the north 6s building.
Reply With Quote
     
     
  #13  
Old Posted Jan 30, 2026, 2:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Have now got the 2nd floor modular steel wall panels installed in the north building A.
Reply With Quote
     
     
  #14  
Old Posted Feb 24, 2026, 7:46 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Looks like the 3rd floor slab is poured and they have started forming the 3rd floor walls for building A. Building B also has the ground floor walls installed and forming for the 2nd floor slab well under way. They have also started framing the first townhouse block A building with framing nearly finished for the 2nd floor.
Reply With Quote
     
     
  #15  
Old Posted Mar 16, 2026, 6:38 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
First three story townhouse block is now framed with roof sheathing installed. Framing the 2nd townhouse block has started with ground floor walls now framed. These townhouses do not have basements. Forming the 4th floor slab on building A has started and the 2nd floor on building B is almost finished.
Reply With Quote
     
     
  #16  
Old Posted Apr 3, 2026, 7:03 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
The 3rd floor steel modular wall panels have started being installed on building 2 and forming for the 5th floor slab on building 1 is underway. Framing for the 3rd floor walls on townhouse block 2 has started.

Last edited by jammer139; Apr 9, 2026 at 4:01 PM.
Reply With Quote
     
     
  #17  
Old Posted Apr 21, 2026, 9:08 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Pouring the 4th floor slab of building 2 today.
Reply With Quote
     
     
  #18  
Old Posted May 1, 2026, 10:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
The 4th floor steel modular walls panels have started going up on building 2 and forming for the 6th floor slab of building 1 is wrapping up. The 4th 3s townhouse unit is well along in terms of framing.
Reply With Quote
     
     
  #19  
Old Posted May 17, 2026, 1:18 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
The 6th floor walls are now installed on building A.
Reply With Quote
     
     
  #20  
Old Posted May 24, 2026, 1:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,873
Forming has started for the roof slab of the 6s building A and the 6th floor slab of building B. Preparing to start installing exterior brick for some of the townhouse blocks.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 11:54 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.