The cycle tracks look awesome and they have so much potential to create a larger east-west bike spine.
I was biking down Besserer on the weekend and I was struck by how similar it is (or could be) to the "Off-Broadway" bikeway along W 8th Ave is Vancouver. Like W 8th is parallel to Broadway and 1 block away, Besserer is parallel to Rideau for its full length and one block south.
The map below shows existing and planned cycling infrastructure in green:
-thin lines for bike lanes or shared lanes
-medium lines for uni-directional protected lanes
-thick lines for MUP or bi-directional protected lanes
The proposed Besserer Bikeway is shown in red.
The
first phase would be a bi-directional cycle track on the north side of Besserer, between Nicholas and King Edward. East of King Edward, Besserer is a quiet street and bikes would share the lanes. This would connect the Rideau Street facility (from Ogilvie Square) all the way to the Rideau River.
The
second phase would be a new active transporation bridge from the end of Daly Ave across the Rideau River at Cummings Island.
When combined with other projects such as the Wellington cycle tracks and the Montreal Rd project, this would link together a bike corridor stretching from the Portage Bridge to Montreal Rd & St. Laurent.