HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Europe


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Dec 21, 2015, 1:58 PM
spc fan spc fan is offline
Registered User
 
Join Date: Oct 2015
Location: Some mysterious place in Hong Kong
Posts: 112
Moscow City "MOKABA-CITY"

Moscow International Business Center (Russian: Московский Международный Деловой Центр; ММДЦ), also referred to as Moscow-City or Moskva-City (Russian: Москва-Сити) is a commercial district in central Moscow, Russia. Located near the Third Ring Road in Presnensky District of Central Administrative Okrug, the Moscow-City area is currently under development.

The Moscow IBC is expected to become the first zone in Russia to combine business activity, living space and entertainment in one single development. The Moscow government first conceived the project in 1992. An estimated 250,000 – 300,000 people will be working in, living in, or visiting the complex at any given time.

Europe's tallest building, the Federation Tower, is in the Moscow IBC. The complex also includes the second-tallest, third-tallest, fifth-tallest, sixth-tallest, and seventh-tallest buildings in Europe.

In order to manage the project a public company CITY was created in 1992 which is responsible for overseeing the initial creation and development of Moscow City as well as its subsequent exploitation. CITY is also a general contractor and both landlord and lessor.

Overall responsibility for the architectural planning and design of Moscow City belongs to the architectural studio No. 6, which is a part of the large Moscow practice Mosproject-2 named after Mikhail Vasilyevich Posokhin. This group, headed by Gennadiy Lvovich Sirota, who is officially the Chief Architect of Moscow City, is in charge of overseeing the design of the complex as a whole and agreeing the details of individual projects. Each and every building lot has its own investor and architect.

The construction of the Moscow IBC is taking place on the Presnenskaya embankment of the Moscow River approximately 4 kilometers (2.5 mi) west of Red Square, and just east of the Third Ring Road. The project occupies an area of 60 hectares, the territory chosen being the only area in central Moscow that can accommodate such a project. Before construction began, the area represented an old stone quarry where most of the buildings were old factories and industrial complexes that had been closed or abandoned. The total cost of the project is estimated at $12 billion.

The buildings are:

100m- buildings: Central Core, Expocentre

100m+ buildings: IQ Quarter, Northern Tower, Tower 2000

200m+ buildings: Grand City Moscow, Embankment Tower, Imperia Tower, Evolution Tower, Yury Dogruky Twin Towers

Supertalls in MIBC: Federation Tower, OKO, Mecury City Tower, Renaissance Moscow Towers, Eurasia Tower, CoC Complex

The MIBC would be completed in 2019.

Copyright@Wikipedia

Last edited by spc fan; Jun 13, 2016 at 5:05 AM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Europe
Forum Jump



Forum Jump


All times are GMT. The time now is 2:56 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.