Tsuut'ina Trail - Calgary SW Ring Road
• Video Link
• Video Link
**2ND NEW VIDEO**
• Video Link
• Video Link • Video Link
construction starts in April...complete in november 2009. Update: Currently some outlets are claiming November 1st, 2009 as the opening date. A forum member personally spoke to the transport minister at a recent community meeting and he said the premier will be at a ribbon cutting ceremony on November 2nd.
Quote:
The Alberta government has signed a 30-year contract with the Stoney Trail Group to design, build, operate and partially finance Stoney Trail from its junction with Deerfoot Trail to 17 Avenue SE. The contract also includes maintenance of Stoney Trail NW from its junction with Deerfoot Trail to 16 Avenue NW.
Total length is 21 kilometres.
Six-lane sections from Deerfoot Trail to Metis Trail (44 Street NE) and McKnight Boulevard to 16 Avenue NE. Other sections are four-lane.
Interchanges at Deerfoot Trail, Metis Trail, Country Hills Boulevard, Airport Trail, McKnight Boulevard, and 16 Avenue NE.
Signalized t-intersection at 17 Avenue SE. An interchange will be built when Stoney Trail is extended south of 17 Avenue SE.
Construction of two new railway bridge structures and rehabilitation of two existing railway bridge structures.
|
Open house is March 29 from 2 to 8 pm at Sunridge Mall
Speed limits:
NE: 100 km/h at first, then 110 km/h around 2015
NW: 80 km/h or 60 km/h depending on construction zones. 100 km/h from bedington to deerfoot
SE & SW: TBD, indications that by 2015 it will be 110 km/h
Government Website with diagrams & pictures:
http://www.transportation.alberta.ca/804.htm
Chinook Roads Partnership website [the SE portion, under construction]:
http://www.sestproject.ca/photo-gallery