Quote:
Originally Posted by jollyburger
Construction. Top left is the conveyor where the muck/tailings are removed. Fresh air duct and possibly air exhaust. The other pipes are liquids (for the foam?) and some communication/electrical lines for the TBM.
|
What interests me is that the conveyor for the spoils is all the way down to Emily Carr.
That means, when either TBM breaks through at Arbutus, the conveyor will be about 5 km long. And there is one for each side.
Wow, when you think about it. I would have thought you the easiest would simply be to bring the spoils back to the first open box and dispose from there.
You learn something everyday.