HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction


115 South 19th Street in the SkyscraperPage Database

Building Data Page   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Sep 10, 2022, 1:48 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
AUSTIN | One Lady Bird Lake | 226 FT | 17 FLOORS

https://www.related.com/press-releases/2...efying-class-commercial-office-buildings

Quote:
Related Companies today announces two category defying, Class-A commercial office buildings in Austin, TX that will introduce a new class of luxury workspace to the City’s growing office market. Marked by Related’s signature amenity-driven design, hospitality services, and commitment to sustainability, One Ladybird Lake and 901 South Congress, will enhance Austin’s office environment to ensure the City’s growing roster of leading companies continually attract the nation’s top talent.

One Ladybird Lake, a joint venture partnership with Christopher Investment Company (CIC), will sit on 750 feet of downtown waterfront property, making it the first commercial office on the lake, and offering tenants one-of-a-kind access to the outdoors.

Designed by KPF, and developed in partnership with Austin-based Christopher Investments, the 15 story building will offer 475,000 sq. ft. of flexible, open plan commercial office space and 16,700 sq. ft. of retail space on the ground level. The building’s unique design will feature 4 large wrap-around terraces and a penthouse bar fostering collaboration indoors and out. Construction is expected to begin in late 2023 with an estimated grand opening in 2025.




__________________
HAIF
Reply With Quote
     
     
  #2  
Old Posted Sep 10, 2022, 3:34 AM
AviationGuy AviationGuy is offline
Registered User
 
Join Date: Dec 2011
Location: Cypress, TX
Posts: 6,022
I like this a lot.
Reply With Quote
     
     
  #3  
Old Posted Jul 25, 2025, 3:24 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
This one has transitioned to residential with site prep underway.

Related Cos. moves forward with 18-story condo, apartment tower along Lady Bird Lake

Quote:
As New York-based Related Cos. makes waves with its vision of a sky-high redevelopment along South Congress, one of its other major developments on the southern shore of Lady Bird Lake is one step closer to becoming a reality.

The site plan for Related’s One Lady Bird Lake, which will be at 151 S. First St. at the Hyatt Regency Austin parking lot just south of the river, was approved July 1. The project was first reported in late 2022 and was originally expected to break ground in late 2023 and be completed this year. Despite the delays, the recent site plan approval means that the project is still alive and could soon begin to rise.

The approved site plan states the 18-story, 200-foot-tall One Lady Bird Lake will be 507,567 square feet with 493,946 square feet of multifamily space, 10,415 square feet of restaurant space and 3,206 square feet of retail. The original vision was for it to be a 475,000-square-foot office building with ground-floor retail, but plans have changed since 2022.
__________________
HAIF
Reply With Quote
     
     
  #4  
Old Posted Jul 25, 2025, 4:04 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
  #5  
Old Posted Sep 12, 2025, 10:55 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
  #6  
Old Posted Jan 29, 2026, 6:48 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
  #7  
Old Posted Mar 31, 2026, 7:33 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
Mock-up confirms the color will be green with copper-like accents. There was different renderings showing a brown, green, or blue facade.

https://www.linkedin.com/posts/reflectio...=ACoAAB9XtVMBrhoBrTTW7KtJc9FatbwBWOpQbWY







__________________
HAIF
Reply With Quote
     
     
  #8  
Old Posted Mar 31, 2026, 8:21 PM
ahealy's Avatar
ahealy ahealy is offline
Registered User
 
Join Date: Jul 2008
Location: San Antonio / Austin
Posts: 2,824
Fuck yes. Now make a 900 footer wrapped in that
Reply With Quote
     
     
  #9  
Old Posted Apr 1, 2026, 2:18 AM
Illithid Dude's Avatar
Illithid Dude Illithid Dude is offline
Paramoderator
 
Join Date: Nov 2010
Location: Santa Monica / New York City
Posts: 3,194
Love the cladding. Great stuff.
Reply With Quote
     
     
  #10  
Old Posted Apr 1, 2026, 1:43 PM
mrnyc mrnyc is offline
cle/west village/shaolin
 
Join Date: Jul 2006
Posts: 15,116
is that ceramic or metal?
Reply With Quote
     
     
  #11  
Old Posted Apr 1, 2026, 7:46 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
Quote:
Originally Posted by mrnyc View Post
is that ceramic or metal?
From the link:

Quote:
Introducing RWW Terra-Glaze™ — bringing the timeless warmth of glazed terracotta to modern facades.

Our Texas team recently hosted a Visual Mockup (VMU) in Austin, TX for the highly anticipated One Lady Bird Lake project, giving partners a firsthand look at how RWW Terra-Glaze™ brings design intent to life.

With the visual warmth and character of glazed terracotta in a lightweight, panelized system, RWW Terra-Glaze™ offers a compelling solution for teams seeking elevated aesthetics, performance, and value.
__________________
HAIF
Reply With Quote
     
     
  #12  
Old Posted Apr 4, 2026, 2:58 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
Cranes going up.





__________________
HAIF
Reply With Quote
     
     
  #13  
Old Posted Apr 21, 2026, 5:07 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
  #14  
Old Posted May 15, 2026, 12:29 AM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
  #15  
Old Posted Jun 1, 2026, 9:48 PM
Urbannizer's Avatar
Urbannizer Urbannizer is offline
Moderator
 
Join Date: Jan 2009
Location: Austin, TX / Portland,OR / Chicago, IL
Posts: 14,383
__________________
HAIF
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Skyscraper & Highrise Construction
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 11:13 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.