Quote:
Originally Posted by coth
MAX
|
Was approved by the city, but the investor don't want to build it anymore
Quote:
Originally Posted by coth
Tower 1
|
Is likely to start construction in 2005 when the problems between Vivico and the city are solved
Quote:
Originally Posted by coth
Frankfurter Sparkasse
|
Haven't heard anything about it in a while
Quote:
Originally Posted by coth
Metzler Bank
|
Same here
Quote:
Originally Posted by coth
Hochhaus an der alten Oper
|
There is a good chance that construction will start this year
Quote:
Originally Posted by coth
Hochhaus Güterplatz
|
It was proposed was but I haven't heard anything about it since then.
Quote:
Originally Posted by coth
Tower 2
|
Depends on if Tower 1 is build. If yes there is a really good chance that Tower 2 will be build as well as part of the UEC project.
Quote:
Originally Posted by coth
Degussa Hochhaus
|
It was proposed was but I haven't heard anything about it since then.