Huron College - 300 Student Residence (Under Construction)

They had the ground breaking today for the new 6s residence building at Huron College to house 300 students.


The tower crane is up and excavation for the foundation is already underway. It appears that Ellis-Don may be the general contractor on this build.



https://london.ctvnews.ca/huron-univ...ence-1.6184859


https://westerngazette.ca/news/huron...6774e8fdc.html

Last edited by jammer139; Dec 11, 2022 at 5:44 PM.
Reply With Quote
     
     
  #2  
Old Posted Mar 6, 2023, 8:17 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
They have made a lot of progress with this building. Looks like they have now poured the ground floor slab and have also poured some of the ground floor walls and posts as they have started forming for the 2nd floor slab as well.
Reply With Quote
     
     
  #3  
Old Posted Apr 10, 2023, 3:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Forming for some of the 2nd floor walls and posts has now started.
Reply With Quote
     
     
  #4  
Old Posted May 2, 2023, 7:25 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Making progress with the 2nd floor walls and posts.


Artist rendering in this article.



https://huronatwestern.ca/news/const...ence-building/
Reply With Quote
     
     
  #5  
Old Posted Jun 1, 2023, 5:30 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Forming started for the 3rd floor walls and posts progressing well.
Reply With Quote
     
     
  #6  
Old Posted Jun 2, 2023, 1:06 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
Quote:
Originally Posted by jammer139 View Post
Making progress with the 2nd floor walls and posts.


Artist rendering in this article.



https://huronatwestern.ca/news/const...ence-building/
Reply With Quote
     
     
  #7  
Old Posted Jun 10, 2023, 2:05 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Making good progress with most of the 3rd floor walls and posts now poured and forming started for 4th floor. This could be topped out by Sept.
Reply With Quote
     
     
  #8  
Old Posted Jun 25, 2023, 7:19 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Making good progress with some of the 4th floor walls and posts now poured and forming starting for the 5th floor slab.
Reply With Quote
     
     
  #9  
Old Posted Jul 21, 2023, 8:58 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Have now got some of the 6th floor walls and posts poured. This new residence building will be topped out by end of Aug.
Reply With Quote
     
     
  #10  
Old Posted Aug 24, 2023, 2:23 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Now forming the mechanical penthouses on this 6s residence building. Exterior steel walls and windows already started on the lower floors.
Reply With Quote
     
     
  #11  
Old Posted Oct 20, 2023, 10:52 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Tower crane is still on site as the 6s building has now been topped out for a while now. Exterior shell walls are now mostly complete as well. Should see exterior wall insulation board and prep for exterior brick veneer installation soon.
Reply With Quote
     
     
  #12  
Old Posted Nov 8, 2023, 5:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Tower crane has now been removed. Making progress installing the exterior wall insulation.
Reply With Quote
     
     
  #13  
Old Posted Jan 19, 2024, 5:27 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Gazette article on the new residence being built. Should see masonry contractor starting soon to work on exterior finishing for this building.



https://westerngazette.ca/news/campu...4ef3daccc.html
Reply With Quote
     
     
  #14  
Old Posted Apr 18, 2024, 6:51 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Masonry contractor has finally started and made some progress installing the exterior brick veneer on the south side.
Reply With Quote
     
     
  #15  
Old Posted Jun 22, 2024, 7:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,015
Finishing touches on the exterior brick and siding on this 6s residence building. Would imagine alot of progress on the interior finishing as well in preparation for the Fall term in September.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:26 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.