Austin | Oracle Campus Updates & News

Just issued on Thursday August 30, 2018, "Approved and Released."

https://abc.austintexas.gov/web/perm...rtyrsn=3121332

Anyone know more information?
Reply With Quote
     
     
  #2  
Old Posted Sep 1, 2018, 1:11 PM
gabetx's Avatar
gabetx gabetx is offline
PrimaPix Visuals
 
Join Date: Oct 2009
Location: San Antonio, TX
Posts: 254
Quote:
Originally Posted by mumu View Post
Just issued on Thursday August 30, 2018, "Approved and Released."

https://abc.austintexas.gov/web/perm...rtyrsn=3121332

Anyone know more information?
It is supposed to be the same size as Phase I, doubling the size of the overall campus and will employ an additional 5,000 workers.
Reply With Quote
     
     
  #3  
Old Posted Sep 1, 2018, 4:21 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
Quote:
Originally Posted by gabetx View Post
It is supposed to be the same size as Phase I, doubling the size of the overall campus and will employ an additional 5,000 workers.
It's going to be 420,000 square feet which is smaller than the existing 560,000 square feet. I think that's space for about 2500 more workers. ~5500 total, when phase 1 is fully staffed (3000 workers), which it probably still isn't. Additional phases 3-4 would be up to another 4500 workers.

What I'm curious about are any construction plans. I walked by there recently and didn't see any ground prep or anything, so I wonder if they're going to build it ASAP or not. I haven't seen the building layout or its exact location.

If anyone knows about those issues, please share.
Reply With Quote
     
     
  #4  
Old Posted Sep 1, 2018, 6:41 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Posts: 57,338
It's insane that in all of downtown it's stated that only about 15,000 people live there, but with this one single development, there's the potential for 10,000 workers. I really have to wonder what that will mean for the future of both downtown and of the Riverside area. I mean, that's a huge amount of employees who could potentially live nearby in large residential developments. I would hope so because 10,000 more car trips in the area aren't going to be a good thing.
__________________
Nevermore
Reply With Quote
     
     
  #5  
Old Posted Sep 1, 2018, 6:57 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,289
Quote:
Originally Posted by KevinFromTexas View Post
It's insane that in all of downtown it's stated that only about 15,000 people live there, but with this one single development, there's the potential for 10,000 workers. I really have to wonder what that will mean for the future of both downtown and of the Riverside area. I mean, that's a huge amount of employees who could potentially live nearby in large residential developments. I would hope so because 10,000 more car trips in the area aren't going to be a good thing.
They desperately need to rebuild the Riverside/35 bridge. Supposedly 35 is back on target for 2025 start date but I'll believe it when I see the contracts go out. 8 billion with no toll money. They have to hope we don't get any recessions until then and see a dip in the oil industry or state sales tax.


Also makes you wonder how bad the 2014 light rail plan would have really been.
Reply With Quote
     
     
  #6  
Old Posted Sep 1, 2018, 7:13 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Posts: 57,338
Oh, yes, I-35 sucks. We were rear ended Thursday afternoon just south of Riverside. We're ok and the damage wasn't that bad, just some damage to the rubber part of the bumper. It was the typical bumper to bumper slow crawl. I've seen worse in that same spot just this year.
__________________
Nevermore
Reply With Quote
     
     
  #7  
Old Posted Sep 1, 2018, 7:18 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 2,289
Quote:
Originally Posted by KevinFromTexas View Post
Oh, yes, I-35 sucks. We were rear ended Thursday afternoon just south of Riverside. We're ok and the damage wasn't that bad, just some damage to the rubber part of the bumper. It was the typical bumper to bumper slow crawl. I've seen worse in that same spot just this year.
Ugh that sucks. Sorry dude. They were suppose to already be in construction for the riverside section of 35 to get rid of that blind spot and drastically improve frontages, entrances/exits and rebuilding that overpass.

I feel like the new 183 expressway is going to attract a lot of people eastward.
Reply With Quote
     
     
  #8  
Old Posted Sep 1, 2018, 8:15 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,285
Quote:
Originally Posted by mumu View Post
Just issued on Thursday August 30, 2018, "Approved and Released."

https://abc.austintexas.gov/web/perm...rtyrsn=3121332

Anyone know more information?
This is probably the same thing as the Waterfront site plan that was posted to AULCC on 08/23. I never got around to posting it, but it shows a new south wing office complex and an extended parking garage. It's 77 pages and very slow loading.

ftp://ftp.ci.austin.tx.us/ATD_AULCC/...02_PLAN_01.pdf
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #9  
Old Posted Sep 2, 2018, 5:13 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
Quote:
Originally Posted by The ATX View Post
This is probably the same thing as the Waterfront site plan that was posted to AULCC on 08/23. I never got around to posting it, but it shows a new south wing office complex and an extended parking garage. It's 77 pages and very slow loading.

ftp://ftp.ci.austin.tx.us/ATD_AULCC/...02_PLAN_01.pdf
Thanks, this is for what I was looking.

The new building is going to be squeezed in between the Azul (apartment building) and the parking garage.
This is leaving them a lot of known empty lot space still, especially all the area south of Elmont (where all the slabs are.) They're really "packing it in" with the new building instead of creating more open space between buildings.
Reply With Quote
     
     
  #10  
Old Posted Sep 3, 2018, 1:37 AM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,285
Based on the site plan, the third Oracle office building will be similar to the first two and jut out directly South of the first two buildings. The parking garage in the rendering would be extended South as well.


https://www.stgdesign.com/oracle-wat...gn3hav2nqzul88
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #11  
Old Posted Sep 3, 2018, 2:51 PM
427MM's Avatar
427MM 427MM is offline
Love Austin
 
Join Date: Sep 2001
Location: Austin
Posts: 1,243
Quote:
Originally Posted by KevinFromTexas View Post
It's insane that in all of downtown it's stated that only about 15,000 people live there, but with this one single development, there's the potential for 10,000 workers. I really have to wonder what that will mean for the future of both downtown and of the Riverside area. I mean, that's a huge amount of employees who could potentially live nearby in large residential developments. I would hope so because 10,000 more car trips in the area aren't going to be a good thing.
The demand for housing in the area is skyrocketing but with our oppressive 1980's land development code we'll likely continue to see city mandated inefficient development deliver little to no attainable housing for those earning under 120% MFI.
__________________
How long will Austinites tolerate NIMBY politicians?
Reply With Quote
     
     
  #12  
Old Posted Sep 24, 2018, 9:01 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,285
There are two new FAA permits for cranes for Phase II - one for the office building and one for the parking garage.
__________________
Follow The ATX on X:
https://x.com/TheATX1

Things will be great when you're downtown.
Reply With Quote
     
     
  #13  
Old Posted Sep 25, 2018, 1:15 AM
JACKinBeantown's Avatar
JACKinBeantown JACKinBeantown is offline
JACKinBeantown
 
Join Date: Jun 2003
Location: Location: Location: Location:
Posts: 9,031
Quote:
Originally Posted by The ATX View Post
Based on the site plan, the third Oracle office building will be similar to the first two and jut out directly South of the first two buildings. The parking garage in the rendering would be extended South as well.


https://www.stgdesign.com/oracle-wat...gn3hav2nqzul88
What a waste of land. Aside from taking up space unnecessarily, they would look cooler standing up... like bear claws.
Reply With Quote
     
     
  #14  
Old Posted Sep 25, 2018, 2:01 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Posts: 57,338
An FAA permit for The Waterfront Phase II says 127 feet.

https://oeaaa.faa.gov/oeaaa/external...85594980&row=5

The garage is listed as 82 feet.

https://oeaaa.faa.gov/oeaaa/external...85608848&row=6
__________________
Nevermore
Reply With Quote
     
     
  #15  
Old Posted Sep 25, 2018, 7:35 AM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
I saw yesterday they made a new rough driveway off Elmont into what'll be the staging area and there are a bunch of new trailers there as well. Thus it seems construction will start relatively soon.

Oracle's stock has been hit again recently due to the inability to meet the demand for cloud computing services - they're losing money by not have sufficient personal.

Last edited by mumu; Sep 25, 2018 at 9:50 AM.
Reply With Quote
     
     
  #16  
Old Posted Sep 30, 2018, 4:52 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
Ground prep has started.
Reply With Quote
     
     
  #17  
Old Posted Oct 30, 2018, 2:35 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
Well underway now.

Reply With Quote
     
     
  #18  
Old Posted Oct 30, 2018, 9:27 PM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Meh
 
Join Date: Jul 2001
Posts: 57,338
__________________
Nevermore
Reply With Quote
     
     
  #19  
Old Posted Dec 17, 2018, 5:06 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 144
Two cranes are up for the Phase Two building (420k sq feet).

Reply With Quote
     
     
  #20  
Old Posted Dec 20, 2018, 6:35 AM
drummer drummer is offline
World Traveler
 
Join Date: Jan 2015
Location: Austin metro area
Posts: 4,564
Is there a rendering for this new addition?
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 6:46 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.