Middlesex Concrete Forming tower crane has now been removed. Masonry contractor now onsite setting up for exterior.
Reply With Quote
     
     
  #42  
Old Posted Jul 2, 2022, 4:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Masonry contractor now installing the exterior brick on the south wall upto the 3 floor using a climbing swing station rig. Will likely take a few months to install the brick around the entire building.
Reply With Quote
     
     
  #43  
Old Posted Jul 12, 2022, 5:02 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Have now reached the 6th floor level on the south wall with exterior brick installation. Windows and balcony door installation appears to be complete now and the roofing contractor appears to be wrapping up. Interior contractors for electrical, plumbing and HVAC are busy roughing in their stuff for the interior partition walls. Would expect drywall to be starting now on the lower floors. Should have tenants by end of year.
Reply With Quote
     
     
  #44  
Old Posted Jul 28, 2022, 3:41 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
The south wall exterior brick is now installed. Preparing to move the swing station lifts to start on the next side.
Reply With Quote
     
     
  #45  
Old Posted Aug 18, 2022, 11:28 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Exterior brick now up to the 6th floor on the southeast side.
Reply With Quote
     
     
  #46  
Old Posted Aug 26, 2022, 1:35 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Wrapping up the exterior brick on the SE corner strip facing Pond Mills Rd. Using a two color pattern around the windows and balcony areas to break up the tan brick color. Should be starting on the NE corner facing Pond Mills next week as they continue to work their way around the building to install the exterior brick veneer.
Reply With Quote
     
     
  #47  
Old Posted Nov 11, 2022, 4:26 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Masonry contractor continues to work on the NE corner and north wall installing brick. Up to the 3rd floor level now. Will likley be working into the new year to finish the exterior brickwork. A lot of grading work for the driveway and parking lot happening this week as they appear to be prepping for curbs and walkway and eventually paving.
Reply With Quote
     
     
  #48  
Old Posted Dec 9, 2022, 6:36 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Working on the exterior brick install on the north side still. Up to the 10th floor now.
Reply With Quote
     
     
  #49  
Old Posted Mar 12, 2023, 3:07 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
They have now completed the north side wall exterior brick install. Setting up hydraulic lift to start brick install on the west side. It will likely take them until end of April to complete the exterior brick on the west side.
Reply With Quote
     
     
  #50  
Old Posted Mar 19, 2023, 3:29 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Up to the 3rd floor now on the south side with external brick install.
Reply With Quote
     
     
  #51  
Old Posted Apr 10, 2023, 1:55 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Only two floors left on south wall to install exterior brick veneer. With good weather this week the brick installation should be done leaving only the final touch ups.
Reply With Quote
     
     
  #52  
Old Posted Apr 18, 2023, 6:15 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
Exterior brick installation now completed as the masonry contractor cleans up the scaffolding.
Reply With Quote
     
     
  #53  
Old Posted May 2, 2023, 3:32 PM
jammer139 jammer139 is offline
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 6,244
LFP article on the nearing completion of this 12s building with a nice photo.



Southside Construction was the general contractor.



The tower at 99 Pond Mills Rd. cost $28 million to build and Homes Unlimited received about $24 million from Canada Mortgage and Housing Corp.


https://lfpress.com/news/local-news/...ket-rate-units


Of note they are still working on the planning for their building at the SOHO site. Currently no work has begun there yet although they had a ground breaking ceremony last Fall and said they hoped to start this Spring.
Reply With Quote
     
     
  #54  
Old Posted Jun 2, 2023, 1:14 PM
johnnyhamont's Avatar
johnnyhamont johnnyhamont is offline
Registered User
 
Join Date: Dec 2015
Posts: 1,115
Some photos of the now-occupying building:


(from LFP)

from Realtor listings for available market rent units:






Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:28 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.