https://www.nytimes.com/2024/10/02/n...n-gateway.html

Penn Station Takes Up Two Blocks. Railroads Say They Must Have More.
After studying other ways to double capacity at the busy transit hub, the railroads that use it say they have concluded that it needs to be expanded.
Reply With Quote
     
     
  #1102  
Old Posted Oct 3, 2024, 11:37 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,283
Quote:
Originally Posted by ChiND View Post
https://www.nytimes.com/2024/10/02/n...n-gateway.html

Penn Station Takes Up Two Blocks. Railroads Say They Must Have More.
After studying other ways to double capacity at the busy transit hub, the railroads that use it say they have concluded that it needs to be expanded.
Their study says that they can achieve 40TPH with through running even when assuming their absurdly long dwells. If dwells (15 min commuter dwells lol) can be modestly shortened you'll get a few more TPH maybe like 44 or 45?
Reply With Quote
     
     
  #1103  
Old Posted Oct 5, 2024, 7:59 PM
chris08876's Avatar
chris08876 chris08876 is offline
NYC/NJ/Miami-Dade
 
Join Date: Jul 2013
Location: Riverview Estates Fairway (PA)
Posts: 47,114
Amtrak, MTA, and NJ TRANSIT Release Feasibility Study as Next Major Step to Increase Capacity at New York Penn Station:

1.
https://new.mta.info/press-release/i...-step-increase
2. https://media.amtrak.com/2024/10/amt...-penn-station/


Oct 2, 2024
Reply With Quote
     
     
  #1104  
Old Posted Oct 12, 2024, 5:08 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 53,010
https://www.enr.com/articles/59491-m...-come-together

More Pieces of $16B Hudson River Rail Tunnel Come Together





By James Leggate
October 11, 2024


Quote:
As work progresses on existing contracts of the $16.1-billion Hudson Tunnel Project between New York City and northern New Jersey, outgoing Gateway Development Commission (GDC) CEO Kris Kolluri said during the commission’s Oct. 11 meeting that seven of the nine contract packages will either be under construction or in procurement by the end of the year.

“A significant amount of work is happening on site and in our finance department,” Kolluri said.

Work on the Tonnelle Avenue bridge, which will carry road traffic over the New Jersey side approach to the rail tunnel, is about 48% complete, according to Hamed Nejad, GDC acting chief technical officer. He also told commissioners that 65% of secant piles for the Hudson Yards concrete casing on the New York side are complete, crews have begun underpinning the High Line, and 17,000 tons of soil have been excavated to date.

In the river, Nejad said crews have been working on a test section of the riverbed for stabilization and are preparing to start deep soil mixing.
Quote:
On the procurement side, GDC issued a request for qualifications for construction of the center portion of the two-tube tunnel. The scope of that contract is planned to include boring two 7,250-ft-long tunnels under the Hudson River using a pair of pressurized face tunnel boring machines, lining the tunnels with precast concrete segmental tunnel lining with a 25 ft, 2 in.-inside diameter, placing precast inverts in the under-river tunnel and the 5,100-ft-long New Jersey side of the tunnel, constructing nine cross passages and other work. Responses are due by Dec. 6, and Gateway leaders say they aim to have a contractor selected in 2026 to complete the work by the spring of 2029.

GDC has planned to build the tunnel in three segments, along with other work separated into additional contract packages. In August, the commission picked Schiavone Dragados Lane JV for a $465.6-million contract to build the New Jersey side of the tunnel. And earlier this year, it shortlisted three teams for the New York side. The shortlisted firms’ responses are due next month.

The commission also plans to release an RFQ for surface alignment work on the New Jersey side in November and order TBMs in December, Kolluri said.


Video Link
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #1105  
Old Posted Oct 14, 2024, 1:43 AM
manchester united manchester united is offline
Registered User
 
Join Date: Jan 2005
Posts: 536
Just a curiosity: can anyone post the LIRR departure times from Penn Station to Jamaica from 1am to 5am before the new February 2023 times?
Reply With Quote
     
     
  #1106  
Old Posted Oct 30, 2024, 2:53 AM
manchester united manchester united is offline
Registered User
 
Join Date: Jan 2005
Posts: 536
Quote:
Originally Posted by manchester united View Post
Just a curiosity: can anyone post the LIRR departure times from Penn Station to Jamaica from 1am to 5am before the new February 2023 times?
Problem solved!
https://web.archive.org/web/20230225...oad/timetables
https://web.archive.org/web/20230225...document/84986
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump



Forum Jump


All times are GMT. The time now is 3:12 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.