Posted Jul 28, 2024, 1:23 PM
|
|
I am the law!
|
|
Join Date: Sep 2002
Location: Toronto+
Posts: 22,325
|
|
Someone on another forum posted that the 1 Yonge developer is contemplating 90 and 95 storey towers . There is no documentation to support that claim and, as the posts suggests, the developer is not committed to it either. The is far too preliminary to change in the database (if the forumer wasn't making it up in the first place)
I guess you don't have documentation either to support developers delaying these proposed plans or putting them up for sale. You are simply basing these projects going stale over the length of time they have been proposed. That's not how the stale status should work. However, stale, proposed, approved is more or less the same to me so I don't really care. It does hurt Koops' numbers of drawings on the SSP pages as stale is not calculated.
|