HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #6941  
Old Posted Yesterday, 2:28 AM
craigs's Avatar
craigs craigs is offline
Registered User
 
Join Date: May 2019
Location: Los Angeles
Posts: 7,078
Quote:
Originally Posted by jd3189 View Post
Do you guys think it would be a better idea for LA to build streetcars/ light rail again through many of the major boulevards like Sunset, Wilshire, Hollywood, etc.?
I think dedicated BRT lanes are the way to go, especially in terms of cost. We could probably have gold-standard BRT on three or four boulevards for the cost of a single light rail line on one of those boulevards. Dozens of miles of steel rails and electrification cost a lot more and require more maintenance than BRT infrastructure.
Reply With Quote
     
     
  #6942  
Old Posted Yesterday, 3:38 AM
Nouvellecosse's Avatar
Nouvellecosse Nouvellecosse is offline
Volatile Pacivist
 
Join Date: Aug 2005
Location: Nova Scotia
Posts: 9,286
Before buses were a thing, streetcars were necessary to haul bus-sized loads. Nowadays buses can do that and if there's room for a streetcar ROW and political will for signal priority then buses can avoid traffic just as well as streetcars can. Modern streetcars can still potentially carry heavier loads than buses since they can be longer, but unless your bus route is running say, every 5 minutes and is at or near capacity, then the extra capacity isn't really needed. But if it is, then converting a really busy bus route into streetcars can reduce labour, energy, and maintence costs. So I'd say it depends how high the current and projected passenger volume on the route is.
__________________
"The reasonable man adapts himself to the world; the unreasonable one persists in trying to adapt the world to himself. Therefore all progress depends on the unreasonable man." - George Bernard Shaw
Don't ask people not to debate a topic. Just stop making debatable assertions. Problem solved.

Last edited by Nouvellecosse; Yesterday at 6:19 PM.
Reply With Quote
     
     
  #6943  
Old Posted Yesterday, 3:52 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,255
People would have kittens at taking away car lanes on any of the major streets to put street cars back. Give me shallow cut and cover Innovia 300 lines with platform screen doors and short headways.
Reply With Quote
     
     
  #6944  
Old Posted Yesterday, 3:54 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,066
Quote:
Originally Posted by k1052 View Post
People would have kittens at taking away car lanes on any of the major streets to put street cars back. Give me shallow cut and cover Innovia 300 lines with platform screen doors and short headways.
Merchants and small business owners would definitely push back against cut and cover too.
Reply With Quote
     
     
  #6945  
Old Posted Yesterday, 3:57 PM
k1052 k1052 is offline
Registered User
 
Join Date: Oct 2007
Posts: 2,255
Quote:
Originally Posted by homebucket View Post
Merchants and small business owners would definitely push back against cut and cover too.
This is a smaller constituency to deal with in LA than literally all drivers.
Reply With Quote
     
     
  #6946  
Old Posted Yesterday, 6:00 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,066
Quote:
Originally Posted by k1052 View Post
This is a smaller constituency to deal with in LA than literally all drivers.
They still have a lot more power than you might think, and can tie up or delay projects just as effectively, if not more.

Regardless of which path is taken, taking lanes away for dedicated BRT vs cut and cover construction for a subway line, it is certain there will be plenty of opposition.
Reply With Quote
     
     
  #6947  
Old Posted Yesterday, 6:10 PM
sopas ej's Avatar
sopas ej sopas ej is offline
Registered User
 
Join Date: Jul 2007
Location: South Pasadena, California
Posts: 6,928
Los Angeles doesn't do cut and cover for subway construction anymore; the last time they did that was the 1990s-early 2-thousand aughts. Even though it was blamed on the contractor, the whole Hollywood Boulevard tunnel collapse fiasco of the mid-1990s put an end to that.

It's been about tunnel boring now.
__________________
"I guess the only time people think about injustice is when it happens to them."

~ Charles Bukowski
Reply With Quote
     
     
  #6948  
Old Posted Yesterday, 6:25 PM
homebucket homebucket is offline
你的媽媽
 
Join Date: Jan 2012
Location: The Bay
Posts: 9,066
^ That too.

So basically the options would be TBM under all these corridors ($$$$) vs at grade light rail ($$) vs BRT ($). I think given the cost and efficacy, BRT would probably be the best option. An at grade light rail line isn't likely to be substantially faster, but have significantly more costs associated with it.
Reply With Quote
     
     
  #6949  
Old Posted Yesterday, 6:49 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
just a pool of mushy goo
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,543
On the Purple Line Extension the running tunnels are TBM bored but the station boxes still require cut and cover construction. The speed and efficiency Metro contractors carried out excavation and temporary steel supported streets really is a feat that has gone underappreciated.
__________________
Everything new is old again

Trumpism is the road to ruin
Reply With Quote
     
     
  #6950  
Old Posted Yesterday, 7:46 PM
craigs's Avatar
craigs craigs is offline
Registered User
 
Join Date: May 2019
Location: Los Angeles
Posts: 7,078
Quote:
Originally Posted by homebucket View Post
Regardless of which path is taken, taking lanes away for dedicated BRT vs cut and cover construction for a subway line, it is certain there will be plenty of opposition.
Opposition doesn't always stop it, though. Metro is currently removing a car travel lane on the stretch of Hollywood Boulevard between Gower and Lyman. The new road configuration includes a protected bike lane, bus boarding areas, and a central turn lane.
Reply With Quote
     
     
  #6951  
Old Posted Yesterday, 9:36 PM
sopas ej's Avatar
sopas ej sopas ej is offline
Registered User
 
Join Date: Jul 2007
Location: South Pasadena, California
Posts: 6,928
Quote:
Originally Posted by Busy Bee View Post
On the Purple Line Extension the running tunnels are TBM bored but the station boxes still require cut and cover construction. The speed and efficiency Metro contractors carried out excavation and temporary steel supported streets really is a feat that has gone underappreciated.
I know that the station boxes are still cut and cover. But with the tunnel boring for the tunnels, though more expensive, there is no disruption at street level, only at the station box construction sites.

I remember how awful it was along Hollywood Blvd. during the subway construction back then, as well as in downtown LA in the early 1990s. Tunnel boring is so much better.
__________________
"I guess the only time people think about injustice is when it happens to them."

~ Charles Bukowski
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:57 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.