https://pro.tucsonaz.gov/parcel_search/12406171B
It looks like there have been plans submitted to CoT in January for the student housing that is set to replace the old TUSD HQ's enormous parking lot.
Looks like a pretty enormous concept in terms of beds. They've submitted two plans to the city, both look like the TUSD headquarters will stay in place. Maybe they'll remodel if and use it as a common area?
One plan is two multi story buildings, one on the parking lot and the other adjacent to the main HQ structure. They'll be connected by a 3rd floor sky bridge over 10th st.
The other is a slightly taller building that is entirely on the parking lot and use the other space as a park.
I wonder how it'll affect operations at The Rock.