Quote:
Originally Posted by darkharbour
That’s my bad, I didn’t intend to cause any confusion, I was using underground parking broadly meaning it’s under the building and currently they are pouring concrete below grade, not in any prescriptive or literal way.
Yes much of the parking structure will be above the final grade of the site, at least according to the drawings available to us now.
|
No problem. It just confused me for a moment and made me think there might be one level below grade and the other above.
It's too bad they aren't a proper underground garage for all the buildings. I assume it is due to the proximity to the water rendering such a design unfeasible? (or is it just a issue with costs making it uneconomical?)