HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation


Reply

 
Thread Tools Display Modes
     
     
     
     
  #1  
Old Posted Yesterday, 3:03 PM
ardecila's Avatar
ardecila ardecila is offline
TL;DR
 
Join Date: Jun 2006
Location: the city o'wind
Posts: 16,520
Quote:
Originally Posted by Randomguy34 View Post
Also lol at the MTA saying the tunnel will cost $3 billion.
That's of course a ridiculous price, but it was based on 1.5 miles of tunneling to bore deep under the cemetery (and several levels below the existing freight tunnel).

The new plan is to cut/cover two additional tracks next to the freight tunnel. It's only 500' of tunnel structure, but it means the cemetery needs to move one of their mausoleums that sits in the way. They have a much larger mausoleum that is newly built, so any "residents" that are relocated would only move a few hundred feet away and into a nicer/newer facility. It may even be possible to leave the existing mausoleum in place and dig underneath it, but that seems very risky from a construction standpoint.

https://allfaithscemetery.org/mausoleums/
__________________
la forme d'une ville change plus vite, hélas! que le coeur d'un mortel...
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 1:49 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.