HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


Reply

 
Thread Tools Display Modes
     
     
  #501  
Old Posted Oct 3, 2024, 11:36 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,833
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.

Last edited by NYguy; Oct 4, 2024 at 12:06 AM.
Reply With Quote
     
     
  #502  
Old Posted Oct 4, 2024, 3:34 PM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,833
https://www.chelseanewsny.com/news/w...nths-YB3715010

Work Begins on New Entrance to Grand Central Madison but It Won’t Open for 18 Months





Ralph Spielman
03 Oct 2024


Quote:
A new entrance to Grand Central Madison, the MTA’s $11.1 billion station that sits a quarter mile underground, is being erected at Madison Ave. and 45th Street. It will carve out a passageway that will cut through a new officer tower now being built and make the gleaming but under-utilized station ADA compatible.

The entranceway won’t be ready for another 18 months, however, but it will at least open long before the new officer tower which is expected to take four years to build.
Quote:
The new entrance will help speed passengers to the new station platforms that are 14 stories below street level, sitting underneath the original Grand Central station.

The new entrance will be part of a new office tower that sits on a plot that once held the building that MTA used as its headquarters from 1979 to 2014 before moving it to Brooklyn.

The space dated from the First World War and was known as the Equitable Trust Building before 1979. The new building over the entrance will be known for now only as 343 Madison.
Quote:
In 2020, BXP was selected to redevelop the site on Madison Avenue and demolition began in February 2021 to begin construction of the entrance, which started on Oct. 1 with the symbolic digging by MTA and local officials. BXP has agreed to build the new ADA compliant Grand Central Madison entrance in advance of the new skyscraper’s completion. The MTA will own the land on which the building is situated; this will mean a revenue stream expected to generate more than $1 billion in ground rent revenues and real estate taxes, dedicated to the now-underfunded MTA capital program.
Quote:
This new entrance to Grand Central Madison’s Long Island Rail Road Concourse will bring the total to six street entrances: 42nd Street and 43rd Street through One Vanderbilt, at 47th Street inside 383 Madison Avenue, two elevator-only entrances in freestanding buildings built by the MTA at 44th Street and 48th Street and now 45th Street.

The MTA has planned two new direct street entrances north of 47th Street, giving even faster access to the LIRR East Side Terminal.
Quote:
What about the new building surrounding the entrance? Right now, it’s an empty space. BXP has big plans for the block-long site. BXP will handle development, property management and leasing of the property of 343 Madison. After a scaling back from the original plans, the building will offer 750,400 square feet of office space, designed by the architectural firm of Kohn Pedersen Fox. They are the same firm that crafted One Vanderbilt, also in the immediate Grand Central area.

In conjunction with the MTA, BXP and its minority partner in this project, the Government Pension Fund of Norway, signed a 99-year ground lease with the MTA with the requirement of construction of a direct access entrance to Grand Central Madison, expected to open sometime in 2026. This is in advance of the building’s opening, whose construction, once started, could take up to four years.

Should BXP not find an anchor tenant for the office space, it has an option to terminate the main lease by July of 2025, and be compensated for the cost of the new constructed entrance to Grand Central Madison.
__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #503  
Old Posted Oct 4, 2024, 10:30 PM
Doubleu1117 Doubleu1117 is offline
Registered User
 
Join Date: Aug 2015
Location: New York
Posts: 131
Quote:
The MTA has planned two new direct street entrances north of 47th Street, giving even faster access to the LIRR East Side Terminal.
Didn't realize they were planning two north of 47th.

So it'll be:

42nd through GCT headhouse
43rd- One Vanderbilt
45th- 343 Madison
47th- 383 Madison

what are the next two? 270 Park and 415 Madison both going to have entrances?
Reply With Quote
     
     
  #504  
Old Posted Oct 4, 2024, 11:09 PM
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 547
Since this tower will presumably have pretty small floor plates, it likely will have smaller, boutique tenants, rather than a massive law firm or corporation. It’s likely users don’t really seem like the type that will pre-lease 300k sf. I’m surprised that BP doesn’t build on spec. You’d think that the Norwegian wealth fund could finance this.


Personally, I’m not a fan of this lackluster, blue box. I’d rather see a RAMSA, five-star hotel/condo rise here.

KPF dropped the ball here. 570 Fifth, while not spectacular, is a much nicer tower. I don’t see how KPF can hit home runs with 1 Vanderbilt and 520 Fifth, and yet, draft a fairly lame tower on this site.

Last edited by ChiND; Oct 4, 2024 at 11:19 PM.
Reply With Quote
     
     
  #505  
Old Posted Yesterday, 1:23 AM
NYguy's Avatar
NYguy NYguy is offline
New Yorker for life
 
Join Date: Jul 2001
Location: Borough of Jersey
Posts: 52,833
Quote:
Originally Posted by Doubleu1117 View Post
Didn't realize they were planning two north of 47th.

So it'll be:

42nd through GCT headhouse
43rd- One Vanderbilt
45th- 343 Madison
47th- 383 Madison

what are the next two? 270 Park and 415 Madison both going to have entrances?

Yes, 415 Madison at 48th Street also needs to get underway. There are a lot of entrances to Grand Central all along the Park Avenue corridor, even one right next to this one.

The new entrances will lead directly to the LIRR Madison concourse. 343 Madison will feed into the furthest south of the 4 escalator wells down to the train platforms.


415 Madison














Some prior work on the 343 Madison entrance...











__________________
NEW YORK is Back!

“Office buildings are our factories – whether for tech, creative or traditional industries we must continue to grow our modern factories to create new jobs,” said United States Senator Chuck Schumer.
Reply With Quote
     
     
  #506  
Old Posted Yesterday, 3:38 PM
TKD's Avatar
TKD TKD is offline
March Forward
 
Join Date: Mar 2022
Posts: 72
Quote:
Originally Posted by ChiND View Post
Since this tower will presumably have pretty small floor plates, it likely will have smaller, boutique tenants, rather than a massive law firm or corporation. It’s likely users don’t really seem like the type that will pre-lease 300k sf. I’m surprised that BP doesn’t build on spec. You’d think that the Norwegian wealth fund could finance this.


Personally, I’m not a fan of this lackluster, blue box. I’d rather see a RAMSA, five-star hotel/condo rise here.

KPF dropped the ball here. 570 Fifth, while not spectacular, is a much nicer tower. I don’t see how KPF can hit home runs with 1 Vanderbilt and 520 Fifth, and yet, draft a fairly lame tower on this site.
Your whole post is based on assumptions, first that the floor plates are somehow very small, second that only boutique businesses would lease here (520 5th Ave has boutique sized office floor plates not this), and third your design opinion based on a render that doesn't even show 1/4 of the entire building and thats focusing on the LIRR entrance.
Reply With Quote
     
     
  #507  
Old Posted Yesterday, 6:15 PM
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 547
Isn’t this 343?

__________________
24601
Reply With Quote
     
     
  #508  
Old Posted Yesterday, 8:47 PM
Ahoi's Avatar
Ahoi Ahoi is offline
Mulan M.
 
Join Date: Feb 2022
Posts: 268
ChiND, the developer decides what he wants and not the architect. The design can still change, because KPF is known for quality.
__________________
War is shit.
Reply With Quote
     
     
  #509  
Old Posted Today, 2:58 AM
TKD's Avatar
TKD TKD is offline
March Forward
 
Join Date: Mar 2022
Posts: 72
Quote:
Originally Posted by ChiND View Post
Isn’t this 343
Yes, of the ULURP issued design, you seem to have forgotten that the building went through another filing in 2022 with another slight massing/ supposed design change that hasnt been fully revealed yet.
Reply With Quote
     
     
  #510  
Old Posted Today, 3:07 AM
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 547
Quote:
Originally Posted by TKD View Post
Yes, of the ULURP issued design, you seem to have forgotten that the building went through another filing in 2022 with another slight massing/ supposed design change that hasnt been fully revealed yet.
I recall you said that but everyone suggested that the design can’t change much. I don’t know why, but that was the consensus. I hope that the ultimate design looks nicer than this.
__________________
24601
Reply With Quote
     
     
  #511  
Old Posted Today, 3:10 AM
TKD's Avatar
TKD TKD is offline
March Forward
 
Join Date: Mar 2022
Posts: 72
Quote:
Originally Posted by ChiND View Post
I recall you said that but everyone suggested that the design can’t change much. I don’t know why, but that was the consensus. I hope that the ultimate design looks nicer than this.
Why wouldnt the design be able to change though? Design of a building is separate from the massing of a building as defined by zoning metrics. Nothing governs the design of a building, the design just conforms to the massing, that doesnt mean it (the design) can't be altered, its just the massing (in terms of maximum building envelope) that cant be altered.

Last edited by TKD; Today at 3:35 AM.
Reply With Quote
     
     
  #512  
Old Posted Today, 3:12 AM
ChiND ChiND is online now
Registered User
 
Join Date: Aug 2023
Location: Sheboygan
Posts: 547
Quote:
Originally Posted by TKD View Post
Why wouldnt the design be able to change though? Design of a building is separate from the massing of a building as defined by zoning metrics. Nothing governs the design of a building.
I’ll take your word for it. You’re an architect. I am not. However, many other people on this board who seem to be in the development industry doubted that any changes to the design would be very different from what we’ve seen. While I find the renderings shown thus far to be mediocre, I look forward to seeing the final design.
__________________
24601
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 10:27 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.