Quote:
Originally Posted by DetroitSky
Glad to see work on McCamley is finally underway!
|
Yes indeed... Battle Creek's 4th tallest was overdue for a refresh! I really hope the dark color turns out well on it. From the below rendering, it looks like they are painting or staining the existing brick, as opposed to cladding over it. The exception being the vertical elements, which I assume are some sort of metal cladding -

Source:
Second Wave Media | BCU
Kalamazoo -
Schematic renderings + a walkthrough animation by Wightman & Associates and DLR Group have been released for the planned ~ $100 million KRESA career tech center in Kalamazoo. The badly-needed new center is intended to be open to high school students in 2024. It will be built on
donated land near Wings Stadium. From the preliminary renderings, it looks like a pretty cool design -

Source:
MLive | Courtesy KRESA
• Video Link
Windows are going in at 400 Rose Phase 2, and water is already flowing at the new nature playscape near Bronson Park. These photos are two weeks old, I just forgot to post sooner -