View Single Post
  #633  
Old Posted Jan 16, 2021, 6:39 PM
deja vu's Avatar
deja vu deja vu is offline
somewhere in-between
 
Join Date: Dec 2008
Location: The Zoo, Michigan
Posts: 3,815
Kalamazoo -

Chick-fil-A Grand Opening - Thursday, 01/14/2021 -

I must say, they did a good job keeping congestion off of W. Main. But at one point, I saw the car line extending all the way through the adjacent Westwood Plaza parking lot, down to Cold Stone. Probably 50 - 60 cars. My hope is that once the hype settles down, this Chick-fil-A will alleviate some of the congestion at Popeyes across the street, where cars will sit on W. Main with their hazards on, as well a the traffic at the Portage Chick-fil-A location. Probably not though -




Source: Instagram | @treystarinc

I spotted this fuzzy rendering of the new Milwood Kalsee Credit Union that will be built at the corner of Portage and Cork. I don't mind the funky architecture but I will really miss the mid-century fire station building that they are demolishing to make way for this.


Source: Instagram | kalseecu

This was a little surprise - apparently Treystar is remodeling the second floor of 151 E Michigan Ave. They call it the Monroe Building, but I know it has the former Kalamazoo Savings Bank building. I don't know what they're planning to do with the first floor, which currently serves as the field offices for CSM Group's CD-12 / 180 E. Water St. crew. Presumably they will do a lot of interior wall partition demo to open up the floor area similar to the second floor -


Source: LinkedIn | Treystar




Source: Treystar

Treystar is also apparently remodeling the atrium in the Main Street East building, which they've already "remodeled" several times in the recent past. It looks like this attempt is a little more involved though - new paint, some accent flooring, new furnishings, and perhaps new railings and accent lighting at each level -


Source: LinkedIn | Treystar

Last edited by deja vu; Aug 13, 2022 at 6:50 PM.
Reply With Quote