^ I can't imagine that it will not get approved. I continue to hope / believe that it will turn out looking better than the representative rendering.
On the eastside, the plans for the gateway project along East Main continue to materialize. Last fall, there was a 2-day fast build for the first of several small homes on long-vacant, highly-visible parcels. Now there is some more information on plans for the
Eastside Gateway Pocket Park, which will include a labyrinth and other features, and will begin construction this Spring.
The time-lapse of the fast-build is pretty impressive to watch.
More about the Eastside Gateway Project.
• Video Link

Source:
Kalamazoo Land Bank | In-Form Architecture

Source:
Second Wave Media | In-Form Architecture