Originally Posted by NYguy
As with the first phase, everything is built at once. The casinos must be built within a given timeframe, and temporary casinos aren't allowed to open. Any pre-opening must be a part of the permanent casino floor.
|
Thanks. So the foundations will be built around the tracks I assume.
If the license is awarded in 2025, I assume that work can start in 2026. I doubt that there will be any issues financing the hotel/casino.