https://sfyimby.com/2025/08/adeline...shby-bart-station-redevelopment-berkeley.htmlAdeline Alliance Team Selected For Ashby BART Station Redevelopment, Berkeley
![]()
By: Andrew Nelson 5:30 am on August 7, 2025
Adeline Alliance Team has been selected to redevelop the Ashby BART Station in the south of Berkeley, Alameda County. The successful vision proposes a densely packed mixed-use hub that ties together community needs and residential services below hundreds of apartments. The project is currently in its preliminary stages as the team and city enter an exclusive negotiation agreement.
The winning proposal consists of roughly six hundred units, with the current iteration expecting 618 apartments. Renderings shared by the expansive design team show an early conceptual design for the purposes of the competition. That team includes DIALOG, Urban International Studios, PYATOK, Yes Community Architects, and Plural Studio.
![]()
While renderings are included in the plan presentation, it must be reiterated that the final design has not been decided. The preliminary plan includes a fifty-fifty mix of affordable and market-rate units. The site plan includes five structures reaching seven stories tall, including two market-rate apartments, two affordable family complexes, and one senior affordable housing project. Roughly 25,000 square feet of leasable retail and office space will be spread across the area.
https://sfyimby.com/2025/10/demolition-underway-for-2300-ellsworth-street-in-southside-berkeley.htmlDemolition Underway For 2300 Ellsworth Street in Southside, Berkeley
![]()
By: Andrew Nelson 5:30 am on October 9, 2025
Demolition work is underway ahead of a seven-story apartment complex at 2300 Ellsworth Street in Southside, Berkeley. The project crews have retained two historic facades overlooking Bancroft Way, with most of the property now cleared for construction. Riaz Capital is the project developer.
LDP Architecture is responsible for the design, having taken over the project from Stanley Saitowitz Natomas Architects. The latest illustrations show a podium-style building above the single-story historic facade. The residential addition will be wrapped with a mix of white or blue fiber cement plaster.
...
The 0.37-acre property is located at the corner of Ellsworth and Bancroft Way, across from Edwards Stadium at the southwest corner of the UC Berkeley Campus. The Downtown Berkeley BART Station is five blocks away, and the busy commercial Telegraph Avenue is two blocks to the east.
University of California Purchases Hotel at 2121 Center Street in Downtown Berkeley
![]()
By: Gabriel Clark-Clough 5:00 am on October 15, 2025
The UC investment arm acted through affiliates to purchase a large hotel at 2121 Center Street in Downtown Berkeley. The purchase appears to be a financial investment by the University of California and not a specific expansion of the UC Berkeley Campus. As such, there are no immediate plans for conversion of the building’s use or layout.
The 331-room Marriott Residence Inn sold for significantly under its appraised value. Despite a 2023 appraisal at $218 million, the property was bought at only $175.8 million in an all-cash deal. The final price was about $531,100 a room. If compared to new construction, estimates place building costs in the range of $700,000 to $900,000 a room.
The falling value is likely due to the recent period of slower growth in the Bay Area lodging market. Many similar properties have seen dropping values, defaults, and foreclosures. However, the University of California still sees this property as a good long-term investment, with spokespersons citing its excellent location and the high profitability of the hotel’s price bracket.
Gibson said UC Berkeley plans to pursue environmental clearance for the project through this year, then seek approval from the Board of Regents next year to proceed with construction.
Officials at UC Berkeley, which houses the smallest percentage of its student body among the 10 UC campuses, set out in 2017 to build 9,000 new student beds. More than 2,400 have opened since then at projects such as the Helen Diller Anchor House in downtown Berkeley, and the xučyun ruwway complex in Albany. The People’s Park project is set to add just over 1,100 beds, and the dorm at Bancroft and Fulton will bring another 1,625.
Valiant Opens at 2538 Durant Avenue, Southside, Berkeley
![]()
By: Andrew Nelson 5:30 am on August 17, 2026
The Valiant has officially opened at 2538 Durant Avenue in Southside, Berkeley. The project has added capacity for 265 students across from the UC Berkeley campus ahead of the fall semester. The project was developed by a joint venture between Canyon Partners Real Estate LLC, the Martin Group, and Valiance Capital. The 88-foot-tall structure contains over 80,000 square feet, primarily for housing with 1,460 square feet of commercial retail space. The residences include a range of studios to four-bedroom apartments, resulting in a total capacity of 265 beds across 83 units. Five dwellings are deed-restricted as affordable to very low-income households.
...
The ground floor includes retail space, bicycle parking, the lobby, and a residential lounge. The lounge features study areas and floor-to-ceiling windows, shining light into the space and creating visual transparency between the interior and sidewalk. Other amenities include co-working spaces, a fitness center, and gathering spaces. The rooftop deck will offer residents a panoramic view showcasing the Campanile Tower, the Berkeley Hills, and the San Francisco Bay.
...
Move-ins started late last week, with the project team telling YIMBY that “the Valiant’s lease-up has been strong leading into the 2026-27 academic year with 98% of the market rate beds leased prior to the school year.”
Good news. Hopefully this one will break ground this year. Some more solid urban minded residential infill coming soon to further enhance Berkeley's pedestrian activity.
The specs:
- 88 ft, 8 floors
- 83 units (26 studios, 8 1BR, 15 2BR, 14 3BR, 6 4BR, 14 5BR)
- 5 of the units will be affordable
- 1,460 sq ft for ground level retail
- Parking for 0 cars and 56 bicycles
The site:
https://goo.gl/maps/4zpWRQ92yosYL9wC8
https://sfyimby.com/2023/06/permits-approved-for-2538-durant-avenue-in-southside-berkeley.html
Meeting Tonight for Amoeba Apartments in Southside, Berkeley
![]()
By: Andrew Nelson 5:00 am on September 10, 2026
The Berkeley Zoning Adjustment Board is scheduled to review plans tonight for the eight-story apartment project at 2455 Telegraph Avenue in Southside, Berkeley. The proposal would add 68 apartments above the Amoeba record store, making adaptive reuse of the existing structure’s facade and historic mural. David Prinz is listed as the property owner, working with planning consultant Rhoades Planning Group.
...
Studio KDA is the project architect, collaborating with 122 West Landscape Architecture. Plans for the redevelopment include preserving the People’s Park Mural, painted by Osha Neumann in 1976 to memorialize the Free Speech Movement of the 1960s.
Amoeba Music occupies a roughly 1.7-acre lot at the corner of Telegraph Avenue and Haste Street, close to the construction of People’s Park by UC Berkeley. Future residents will be in the heart of the city’s college-oriented retail thoroughfare just a few blocks away from the UC Berkeley campus.
Construction Underway At 2138 Kittredge Street, Downtown Berkeley
![]()
By: Andrew Nelson 5:30 am on November 20, 2026
Construction is currently underway for the eight-story infill at 2138 Kittredge Street in Downtown Berkeley, Alameda County. Crews have already demolished the Fitzpatrick House, with foundation work underway and concrete now rising for the first floor. The project, dubbed StudiOne, will add 66 studio apartments to the narrow parcel. Austin Group is responsible for the project, with Hawk Builders Group involved as the general contractor.
...
Niles Bolton Associates is responsible for the design. The latest renderings show a vertically articulated facade with a mix of painted stucco and wood-look vertical panels.
The 0.15-acre property is located along Kittredge Street between Oxford Street and Shattuck Avenue, half a block from the southwest corner of the UC Berkeley campus and two blocks from the Downtown Berkeley BART Station. The site is next to 2176 Kittredge Street, an apartment complex designed by Kava Massih Architects, and across the street from the California Theater, which, until mid-last year, was expected to be converted into a 23-story residential tower.