Nice little project!
The specs for 2900 Shattuck Ave:
- 11 floors, 125 ft
- 242 units (219 studios, 9 1BR, 13 2BR, 1 3BR)
- 30 of the units will be affordable
- 3,720 sq ft for retail
- Parking for 13 cars and 68 bicycles
The site:
https://maps.app.goo.gl/4GfanV9ANkMnZfT37
https://sfyimby.com/2026/10/plans-approved-for-2900-shattuck-avenue-south-berkeley.html
The specs for 2900 Shattuck Ave:
- 11 floors, 125 ft
- 242 units (219 studios, 9 1BR, 13 2BR, 1 3BR)
- 30 of the units will be affordable
- 3,720 sq ft for retail
- Parking for 13 cars and 68 bicycles
The site:
https://maps.app.goo.gl/4GfanV9ANkMnZfT37
Plans Approved For 2900 Shattuck Avenue, South Berkeley
![]()
By: Andrew Nelson 5:30 am on October 16, 2026
Plans have been approved for an 11-story apartment complex at 2900-2920 Shattuck Avenue in South Berkeley, Alameda County. The approval brings 242 residential units closer to reality at a low-slung commercial lot directly across from the Berkeley Bowl grocery store. NX Ventures is the project sponsor. Stackhouse De la Peña Trachtenberg Architects is responsible for the design. Facade materials will include wood-look siding and insulated panels. The exterior will feature a checker pattern and Juliet balconies.
...
The development will include 30 units of affordable housing, of which 22 will be for very-low-income households and eight for moderate-income households. The inclusion of below-market-rate housing allowed the application to use the State Density Bonus law to increase residential capacity above base zoning with various waivers and concessions. For 2900 Shattuck Avenue, the application requested waivers for zoning rules related to open space, bicycle parking, height limits, front setbacks, lot coverage, and the floor area ratio.
The 0.45-acre property is located at the corner of Shattuck Avenue and Russell Street. Future residents will live across from the Berkeley Bowl grocery store and two blocks away from the Ashby BART Station. Demolition will be required for two existing commercial structures and a surface parking lot. Construction is expected to last around 16 months from groundbreaking to completion. Work is estimated to start early next year.
https://sfyimby.com/2026/10/plans-approved-for-2900-shattuck-avenue-south-berkeley.html